APR-21-97 MON 08:07 AM EHD/HMD FAX N0. 9163867011 P. 04 <br /> Lerner Texaco <br /> 521 North Cherokee Lane, Lodi <br /> Site Code 1324 <br /> 19 April 1997 <br /> Page 4 <br /> Schedule: <br /> Within three weeks of ac ceptancetapproval of the scope of work outlined above <br /> by the SJCPHDIEHD, a drilling contractor will be selected to assist with the <br /> completion of the boring and well installations and a "pre-approval" package will <br /> be submitted to the Fuad <br /> Pre-approval plus two weeks Encroachment and well installation permitting <br /> Well survey <br /> Pre-approval plus five weeks Bonng/Weil installing, surveying, developing, <br /> and sampling <br /> Pre-approval plus 8 weeks Receipt of analytical data, report <br /> preparation. <br /> Pre-approval plus 12 weeks Report submittal <br /> Pre-approval plus 17 weeks: First round of quarterly groundwater <br /> sampling <br /> Because pilot testing of a vapor extraction system was not a "bid item" in the original <br /> work plan prepared by WEGE for bid solicitation, I am not sure that the SB 2004 Fund <br /> administration will allow me to perform that task Mr H M. 'Cris' Hamilton and I will be <br /> inquiring tf they are willing to reimburse for reasonable costs, I will submit a fetter <br /> amendment to include a vapor extraction pilot test with the above proposed scope of <br /> work I would anticipate that the inclusion of the pilot test will delay the report submittal <br /> by approximately six weeks Please do not hesitate to call meat(916) 686-9315 or(916) <br /> 386-7061 if you have any questions or concerns. <br /> Sincerely, <br /> Dana W Booth, R_G <br /> Attachment <br /> cc Mr H M 'Cns' Hamilton (with attachments) <br /> d'%wardpcwa 4 b139_1334S7n <br /> 0 <br /> 'r <br />