Lerner Texaco <br /> 521 North Cherokee Lane, Lodi <br /> Site Code 1324 <br /> August 1, 1995 <br /> Page 3 <br /> Schedule <br /> Within three weeks of acceptance/approval of the scope of work outlined above by the <br /> SJCPHD/EHD, a drilling contractor will be selected to assist with the completion of the boring <br /> and well installations <br /> Approval plus five weeks Encroachment and well installation permits will be obtained <br /> Approval plus eight weeks Bonng/Well installing, surveying, developing, and sampling will <br /> begin <br /> Approval plus 11 weeks Receipt of analytical data, report preparation <br /> Approval plus 14 weeks Report submittal <br /> Because pilot testing of a vapor extraction system was not a "bid item" in the original workplan <br /> prepared by WEGE for bid solicitation, I am not sure that the SB 2004 Fund administration will <br /> allow me to perform that task Mr H M 'Cns' Hamilton and I will be inquiring If they are <br />�J willing to reimburse for reasonable costs, I will submit a letter amendment to include a vapor <br /> extraction pilot test with the above Proposed scope of work I would anticipate that the inclusion <br /> of the pilot test will delay the report submittaly approximately six weeks <br /> re <br /> o � <br /> Dana W Booth, R G EX 7 <br /> s� �r <br /> Attachments qTF CSF GF"!�`� <br /> cc Mr H M 'Cns" Hamilton {with attachments} r <br /> d lwordprocldwb139_132495a <br /> oil <br />