Laserfiche WebLink
lA ACTIVITIES CONDUCTED THIS QUARTER <br /> • Activities conducted during this time period have included the sampling of the six onsite <br /> I p P <br /> groundwater monitoring wells. Groundwater samples were collected from the six onsite wells <br /> and submitted to a state certified analytical laboratory for determination of hydrocarbon content <br />' All purge water and drill cuttings were drummed on site in U S Department of Transportation <br /> approved 55-gallon drums, labeled and sealed pending appropriate sampling and disposal <br /> Data Provided with this Report <br /> Regional Site Location Map of California(Figure 1) <br /> Regional Site Groundwater Basin Map of California (Figure 2) <br /> Site Location Map (Figure 3) <br /> Topographic Map of Site (Figure 4) <br /> 4th Quarter 2005 Monitoring Event Data Map (Figure 5) <br />' Hydrograph of Monitoring Well PT-MW 1 (Figure 6) <br /> Hydrograph of Monitoring Well PT-MW3 (Figure 7) <br /> Summary of Groundwater Monitoring Data(Table 1) <br /> Tabulation of Groundwater Monitoring Data(Table 2) <br /> Summary of Groundwater Sample Analytical Results (Table 3) <br /> Tabulation of Groundwater Sample Analytical Results (Table 4) <br /> Appendix 1- Groundwater Monitoring Procedures and Sample Handling Protocol <br /> Appendix 2- Well Development/Purging Worksheets <br />' Appendix 3- Analytical Laboratory Reports For Groundwater Samples <br /> • <br /> r <br /> Mam1D11 nvuoomentailParmarTex3w'tepoiU\QMR0123105 wpd 2 <br /> I <br />