Laserfiche WebLink
1.0 ACTIVITIES CONDUCTED THIS QUARTER <br /> . Activities conducted during this time period have included the sampling of the six onsite <br /> Igroundwater monitoring wells Groundwater samples were collected from the six onsite wells <br /> and submitted to a state certified analytical laboratory for determination of hydrocarbon content <br /> All purge water and drill cuttings were drummed on site in U S Department of Transportation <br /> approved 55-gallon drums, labeled,and sealed pending appropriate sampling and disposal <br /> Data Provided_ with this Report <br /> Regional Site Location Map of California(Figure 1) <br /> Regional Site Groundwater Basin Map of California(Figure 2) <br /> Site Location Map(Figure 3) <br /> Topographic Map of Site(Figure 4) <br /> 2'Quarter 2005 Monitoring Event Data Map (Figure 5) <br /> Hydrograph of Monitoring Well PT-MW 1 (Figure 6) <br /> Hydrograph of Monitoring Well PT-MW3 (Figure 7) <br /> Summary of Groundwater Monitoring Data(Table 1) <br /> Tabulation of Groundwater Monitoring Data(Table 2) <br /> Summary of Groundwater Sample Analytical Results(Table 3) <br /> Tabulation of Groundwater Sample Analytical Results(Table 4) <br /> Appendix 1-Groundwater Monitoring Procedures and Sample Handling Protocol <br /> I Appendix 2- Well Development/Purgmg Worksheets <br /> Appendix 3-Analytical Laboratory Reports For Groundwater Samples <br /> I <br /> M=\D\EnvirmmeMaAParmwT=roWq om\QMR063045 2 <br /> • <br /> i <br /> I <br />