My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001844
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:29:31 PM
Creation date
5/7/2019 2:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001844
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> r <br /> APPENDIX 1 <br /> r GROUNDWATER MONITORING,SAMPLING, <br /> AND SAMPLE HANDING PROTOCOL <br /> r .� l�jotifirauons <br /> Prior to performing any field work, the client,regulatory agency,and property <br /> r owner/manager with j unsdiction over the subject site are notified Notifications are made a <br /> minimurn of 48 fours prior to sampling, or as required by the client or regulator <br /> rI W_pterLevel Measprement$ <br /> Prior to performing purge or no-purge sampling,water level measurements are collected <br /> raccording to the following procedures <br /> * All wells are checked for phase-separated hydrocarbons with an acrylic batter or <br /> r oil/water interface meter <br /> • To avoid cross contamination, water levels are measured starting with the <br /> lustoncally "cleanest" wells and proceeding to the historically "dirtiest" <br /> r Water levels within each well are measured to an accuracy of �Q Ol foot using an <br /> electric measuring device and are referenced to the surveyed datum(well cover or <br /> top of casing) When measuring to top of casing, measurements are made to the <br /> r notched(or otherwise marked)point on casing If no marking is visible,the <br /> measurement is made to the northern side of the casing <br /> If possible,all wells are gauged within a short time interval on the same day to <br /> r obtain accurate measurements of the potentiometnc surface <br /> • All measurements are reproduced to assure validity, and measuring equipment is <br /> decontaminated between wells <br /> r3. Phase ar Hy4EqMban <br /> rIf phase-separated hydrocarbon(PSH)is encountered, its thickness in the well and the <br /> depth to the interface between the PSH and the water in the well are measured using one or both <br /> of the following methods <br /> r - an electronic oil-water interface meter is used to measure the depths to the top of <br /> the PSH and to the top of the water,and/or <br /> r an electronic water level meter is used to measure the depth to the tap of the wafter <br /> and a Clear bailer is used to measure the PSH thickness <br /> r The potentiornmenc surface elevation is calculated as <br /> TOC -DTW + 0 74PT <br /> r Where TOC W top-of-casing elevation, DTW=depth to water(interface), and PT=PSH <br /> thickness <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.