My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001845
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:29:31 PM
Creation date
5/7/2019 2:23:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001845
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 SITE CHARACTERIZATION INVESTIGATION <br /> To achieve the current site characterization investigation objectives, the following scope of work was <br /> conducted <br /> 1 Permitting and Mobilization <br /> 2 Preparation of Workplan and Health and Safety Plan <br /> 3 Field Investigation <br /> 4 Laboratory Analysis <br /> 5 Investigation Derived Waste Disposal <br /> 6 Investigative Report Preparation <br /> 31 Permitting and Mobilization <br /> A drilling permit for soil borings and groundwater monitoring wells was procured from the PHSEHD <br /> (Appendix I) Underground Service Alert was notified of the subsurface investigation at least 48 hours prior <br /> to initiation of the investigation Appendix I contains copies of the PHSEHD drilling permits,City of Lodi <br /> permits, and related PHSEHD correspondence <br /> 3.2 Preparation of Workplan and Health and Safety.Plan � <br /> A workplan was prepared that included the project objectives, scope of work, soil and groundwater boring <br /> and sampling procedures,analytical methods,and schedule The work plan was submitted to PHSEHD on <br /> April 11,2003 A site specific Health and Safety Plan was prepared in accordance with 29 Code of Federal <br /> Regulations 1910 120 The Health and Safety Plan procedures for work to be performed at the site,chemical <br /> hazard information, site safety officers, and a preferred medical emergency location <br /> 3.3 Field Investigation <br /> The field drilling portion of the investigation was conducted during August and September, 2003 The <br /> workplan had been approved for the drilling and sampling of 3 soil borings and the drilling, sampling, and <br /> completion of 7 monitoring wells However, conditions encountered required the expansion of the soil <br /> boring phase of the investigation as directed by PHSEHD staff to a total of 8 exploratory soil borings, and <br /> three additional groundwater monitoring wells Details of the investigation are provided in the following <br /> sections <br /> 01 Mmn1D\Envwonmenta[Tamw'fexaw\Repods`SAR1203 wpd Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.