My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001845
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
521
>
3500 - Local Oversight Program
>
PR0544430
>
ARCHIVED REPORTS XR0001845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:29:31 PM
Creation date
5/7/2019 2:23:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001845
RECORD_ID
PR0544430
PE
3526
FACILITY_ID
FA0005370
FACILITY_NAME
PARMAR TEXACO
STREET_NUMBER
521
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
521 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUNDWATER MONITORING,SAMPLING, <br /> AND SAMPLE MANAGEMENT PROCEDURES <br /> L Notifications <br /> Prior to performing any field work,the client, regulatory agency,and property owner/manager with <br /> jurisdiction over the subject site are notified Notifications are made a minimum of 48 hours prior to <br /> sampling, or as required by the client or regulator <br /> 2. Water Level Measurements <br /> Prior to performing purge or no-purge sampling, water level measurements are collected according to the <br /> following procedures <br /> • All wells are checked for phase-separated hydrocarbons with an acrylic bailer or oil/water <br /> interface meter <br /> • To avoid cross contamination,water levels are measured starting with the historically <br /> "cleanest" wells and proceeding to the historically "dirtiest " <br /> • Water levels within each well are measured to an accuracy of =E0 01 foot using an electric <br /> measuring device and are referenced to the surveyed datum(well cover or top of casing) When <br /> measuring to top of casing, measurements are made to the notched (or otherwise marked)point <br /> on casing If no marking is visible,the measurement is made to the northern side of the casing <br /> • If possible, all wells are gauged within a short time interval on the same day to obtain accurate <br /> measurements of the potentiometric surface <br /> • All measurements are reproduced to assure validity, and measuring equipment is <br /> decontaminated between wells <br /> 3. Phase Separated Hydrocarbon <br /> If phase-separated hydrocarbon(PSH) is encountered, its thickness in the well ai)d the depth to the <br /> interface between the PSH and the water in the well are invasured using one or bpath of the following <br /> methods <br /> • an electronic oil-water interface meter is used to measure the depths to the top of the PSH and <br /> to the top of the water, and/or <br /> • an electronic water level meter is used to measure the depth to the top of the water and a clear <br /> bailer is used to measure the PSH thickness <br /> M=L D1EnvironmentW\PaznzarTexaco\Reporls\SAR1203 wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.