Laserfiche WebLink
Ilealth arid. sarety Plan <br /> Under•groutKl 1'ttrtk Removal . <br /> Over=Excavation Resample , <br /> INTRODUCTION <br /> PUFFF'CL9E AND SCOPE J <br /> The llealth aril safety Plan, ror underground tank removall .bver"�excavationj. <br /> provides for the pr•oLectlm or ort-slEe personnel arid the surrounding <br /> community during site cl)aracterizatlort activities. 'I'lre rerluirelnentUtall <br /> gpec'l ficatiotts acrd procedures presented w1Lh Lhls plan will 11 o s <br /> s personnel on-site, Including employees, sub-contractors, site visitors arKl <br /> regulatory agency personnel. <br /> f <br /> KEY PERSONNEL <br /> - 11AZAnn ANALYSIS <br /> traletnn ccxttaminated soil is <br /> Tit 'most significattL risk associated with pe use of <br /> ex{x�sure to aromatic canlrourrds. Skin contact will be eliminated by <br /> clothing, .eye wear, and gloves and the ittltalatiotihazard will be monisited <br /> using appropriate reslrlratory protective. devices as •determlrted by <br /> air mmitorirtig. The Saret,y CoordInaLor/Pr•ojecL Manager will, establish an <br /> exclusion zone enccxrjpassing a 5o foot radius from, tilts work steak. Access <br /> Within tills zone will be iimited to re�ult-ed per'sottnel. <br /> Total organic <br /> vapors Will be rtmitored wiLlrirt the excluslottZ�axic9o[gthe�r�oinatlrzation <br /> detector (PID) calibrated for benzene the eros <br /> hydrocarbots. Current enrorceabaeeand rented deo expotiure llmitationq <br /> for 'potential site contaminants 1 <br /> F RECEIVE _k <br />