My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
3500 - Local Oversight Program
>
PR0544433
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 3:49:49 PM
Creation date
5/7/2019 3:42:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544433
PE
3529
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
02
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ii <br /> SOIL SAMPLING PROTOCOL <br /> M <br /> r I. SOIL SAMPLING BY DRILLING RIG ' <br /> 1) Review-site�p'r pp for boring locations an(.,. special instructzons.-Confi.rm <br /> boring locations in fief--witlrtlient: Have Und rground Service Alert {USA) <br /> mark utilities in area prior to drilling. <br /> 2) Prior to initiating an exploratory boring, all equipment,to be used during ing.-- i <br /> and sampling operation is steam cleaned. Such!Lequioment includes_,_but:is-net-. <br /> rod sam -lets and brass sampler liners. <br /> limited to, augers, bits, drilling p P <br /> Additionally, between sampling intervals, the sampler is thoroughly cleaned with <br /> , <br /> M <br /> a dilute trisodium phosphate solution and rinsed'with clean tap water or distilled <br /> water. i <br /> � <br /> 3) Each exploratoryboring is drilled-with-a-truck-mounted drilling rig using either <br /> solid flight or hollow stem augers. The boring isiladva cedto <br /> the desired <br /> sampling depth and the sampler is lowered to the bottom of the hole---The <br /> sampler is driven a maximum of 18 inches into the undisturbed soils ahead of the <br /> auger by a 140-pound, rig-operated hammer falling 30 inches. The number of <br /> f blows required to drive the sampler the final 12 inches is recorded on the boring <br /> log. When necessary, the sampler may be pushed by ihe drill rig hydraulics. In <br /> e the pressure exerted in pounds r care inch) is recorded. After the <br /> . flus case, pre { Po per �; , <br /> sampler has penetrated the full depth, it is retrieved to the surface. i <br /> ifornia modified sampler 3 inch or <br /> are either a Cal { <br />� 4 The samplers commonly used P <br /> P y :p <br /> 2 �neh O.D. . The standard <br /> D or a standard penetrometer ) <br /> 2.5 inch O. .) pe { , <br /> penetrometer does not contain sample liners and is used to determine soil strength <br /> characteristics and visually characterize the subsurface materials. If samples are <br /> collected for laboratory analysis the California modified sampler, equipped with <br /> brass liners, is used except when the analysis will include copper or zinc. In this <br /> instance, the sample should be taken with the standard penetrometer and placed in <br /> a labeled plastic bag, <br /> it it <br /> Upon retrieval, the sampler is disassembled into its ;component parts. One or <br /> ,. <br /> more of the liners is selected for chemical analysis.:,' The ends of the selected <br /> liner(s) are sealed with aluminum foil or teffon'tape,napped with plastic caps, <br /> EXCELTECH, INC. <br /> Soil Sampling Protocol r <br /> Latest Revision: March 28, 1990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.