Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 2 of 2 <br /> VL UNDER DISPENSER CONTAINMENT (UDC)MONITORING at 0-p as <br /> that a t <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> 1.CONTINUOUS ELECTRONIC MONITORING El2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-540, <br /> ❑ 4,NO DISPENSERS ❑ 99.OTHERS ci 49as4b <br /> _............ . .......- - ......-- ._.. _......_....._.. ------- - ---—... .F$.- ) <br /> LEAK MONITOR MANUFACTURER: 4--.> 41111' MODEL#: 3 <br /> LEAK SENSOR MANUFACTURER: 2 r, 490.57. MODEL#(S): _ 490ss, <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL Ai,ARMS. a.YES ❑ b_NO 49059, <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN_ X,,YES ❑ b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 490-61' <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES El b,NO a90-62. <br /> ----- ----- — -- - - •..--- ----- ---- _..._ - ---.._ ___.. _.._.... ._ ............ <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL ❑ 2 DOUBLE WALL 491-60-. <br /> IF DOUBLA)MALL: 490-64a, <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b,PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b, <br /> VTI. PERIODIC SYSTEM TESTLSTG <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> n MUST BE PERFORMED. PERIODIC BLD IS PERFORMED EVERY 36 MONTHS AS REQUIRED,p3 ccR :644.1 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTER EVERY 36 MONTHS. 490-66. <br /> ® 3_SPILL BUCKETS ARE TESTED ANNUALLY. 49o-G7. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-66. <br /> ® a,ALARM LOGS ❑ b.VISUAL.INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) [] e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) © g-CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAJNJNG <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 491-690-. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c, <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49049d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490(90, <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490.69£. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> F1SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS- <br /> El <br /> 440-69h, <br /> ❑ OTHER(Specify): 490.691, <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the international Code Council 451-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire,This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan, <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan, <br /> D Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional Comments hatro or indicate how many pages with additional inform tion on Specific monitoring pr eedurea are attara ted to this Ian, a9oai. <br /> iS 0 .� Q Ledaaajs <br /> XI. PERSONNEL RESPONS ILL IE <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> bX_this_plan occurs;2_)all conditions,that indicntc a.possiblc roleAse are.lnvestigatedt sod 3.�all monitoring rccords.are_maintain_ed Rropery................__.___._.___.___.__.__.._......... <br /> THE FOLLOWING PERSON(S)ARE SIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Ci�`JGR-�`1. J.�i�A'' 490-72 TITLE! A Z yj � 0-v f/fa _490-73. <br /> NAME: 490-74, TITLE: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-Lip action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify t t the information herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATUREDATE: 49D.77' <br /> REr�Rma[NTIh G' 1.Tenk Owner/Oneri� 2.Focilii Own -erni6r J.AWJ,0-,w-d 0-e c.nwi�eof0w 490-16. —2 —� V <br /> APPLICANT NAME(pri > 490-78. APPLICANT TITLE: 490-79. <br /> Z' A <br /> UPCF UST-D(12/2007)-314 www,unidocs_arg <br /> r0vd 80109SHOZi 'old M H SSHI WO Q00,d Ind ZZ : 10 Idd/HOUSIAH <br />