My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Nathan Crum - 2 - 15 June 2009 <br /> Valley Pacific Petroleum ServiceF <br /> Installation of an off-site well east of MW-13 will commence once site access to the <br /> neighboring property is granted. However, GZA has been unsuccessful at gaining access <br /> despite repeated attempts at reaching the property owner through verbal and written <br /> correspondence. <br /> Starting in the fourth quarter of 2008, biogeochemical monitoring was conducted in four wells <br /> for a year-long assessment of the baseline bioremediation potential to support the <br /> implementation of an air sparge/soil vapor extraction (AS/SVE) pilot study. A fifth well, MW-3 <br /> was added during the fourth quarter of 2008. Valley Pacific selected AS/SVE to remediate the <br /> COCs in the groundwater and vadose zone based on the rationale that AS/SVE would likely <br /> enhance the biodegradation potential at the Site by increasing the dissolved oxygen (DO) <br /> levels in groundwater. From upgradient to downgradient, the wells include MW-12, MW-2, <br /> MW-6R, MW-3, and MW-10. <br /> Our comments are presented below. <br /> 1. The year-long baseline study will be concluded after a fourth quarter of monitoring is <br /> conducted in July 2009. However, Valley Pacific has not yet conducted a sampling event <br /> for microbial enumeration. Valley Pacific needs to ensure that microbial enumeration <br /> sampling is conducted during the remaining quarter of the study. <br /> 2. On 11 June 2009, Central Valley Water Board staff initiated verbal correspondence with <br /> Mr. John Denigris, owner of the property where the installation of an additional well is <br /> proposed. Mr. Denigris instructed me to have GZA call him to arrange for the installation of <br /> the well. I conveyed the message by email to Mr. Greg Stahl of GZA and requested that he <br /> inform me when access is arranged. <br /> If you have any questions regarding this letter, you may contact me at (916) 464-4811 or <br /> betaylor@waterboards a.gov. <br /> BRIAN TAYLO P.G. <br /> Engineering; eologist <br /> cc. Mr. Harlin Knoll, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Gregory Stahl, Ground Zero Analysis, Inc., Escalon <br /> Mr. Patrick Riddle, Law Offices of Patrick D. Riddle, Acampo <br /> Mr. John Miller, Valley Pacific Petroleum Services, Inc., Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.