My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. <br />Woolsey Oil Company <br />San Joaquin County <br />-4- <br />if applicable, the reasons for and duration of all interruptions in the operation of any <br />remediation system, and actions planned or taken to correct and prevent interruptions. <br />An annual report shall be submitted to the Board by 1 February (1 November for semi-annual <br />monitoring) of each year. This report shall contain an evaluation of the effectiveness and <br />progress of the investigation and remediation, and may be submitted with the fourth quarter (or <br />second semi-annual) monitoring report. The annual report shall contain the following <br />minimum information: <br />(a) both tabular and graphical summaries of all data obtained during the previous year; <br />(b) groundwater contour maps and pollutant concentration maps containing all data obtained <br />during the previous year; <br />(c) a discussion of the long-term trends in the concentrations of the pollutants in the <br />groundwater monitoring wells; <br />(d) an analysis of whether the pollutant plume is being captured by an extraction system or is <br />continuing to spread; <br />(e) a description of all remedial activities conducted during the year, an analysis of their <br />effectiveness in removing the pollutants, and plans to improve remediation system <br />effectiveness; <br />(f) the anticipated date for completion of cleanup activities; <br />(g) an identification of any data gaps and potential deficiencies/redundancies in the monitoring <br />system or reporting program; <br />(h) if desired, a proposal and rationale for any revisions to the groundwater sampling plan <br />frequency and/or list of analytes. <br />The results of any monitoring done more frequently than required at the locations specified in the <br />MRP also shall be reported to the Board. The Discharger shall implement the above monitoring <br />program as of the date of the Order. <br />Ordered by: <br />THOMAS R. PINKOS, Acting Executive Officer <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.