Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE I <br /> TYPE OF ACTION ❑ I.NEW PLAN CHANGE OF INFORMATION M01 <br /> PLAN TYPE 4ONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mut <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency,Use Onh) — _ <br /> FACILITY NAME ( 4S "T � � Mb.. <br /> FACILITY SITE ADDRESS � 5C>> Al A&M W (4, MW ck--me M05 <br /> U. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annwhichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY [199.OTHER(Specify): Moi <br /> ualI <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e..location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form.Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) 1010 <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: &a. RY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSU d.UNDER VACUUM M11PANEL MANUFACTURER: U i�l �J M12 MODEL#: -791t-3 `"OLrZ-SL- M13. <br /> LEAK SENSOR MANUFACTURER: M14 MODEL#(S): !91t� "" MIs <br /> _9-ro AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16 MODEL#: M17. <br /> IN-TANK PROBE MANUFACTURER: MIR MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> Pe �'Y <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. Elb.0.2 g.p.h. E] c.OTHER(Specify): M22 M23. <br /> VENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mea <br /> WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: E] a.36 HOURS F1 b.60 HOURS Mzs. <br /> �EGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: C3 a.ANNUALLY ❑ b.BIENNIALLY [I c.OTHER(Specify): Mze. Mrr. <br /> .VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Rcquircs agency approval) <br /> M2R. <br /> OTHER(Specify): <br /> V. PIPE MONITORING <br /> M NITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: [K a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE(�p❑ d.UNDER VACUUM M3 i <br /> PANEL MANUFACTURER: �t'YL 12E S 3SC� M32 MODEL#: Z`t0 ..,.r)Z 2-SC- M33 <br /> �'• M3a. MODEL#S G 2� M35. <br /> LEAK SENSOR MANUFACTURER: 'r tJ�1t�VI �� O 77 ���tl� <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? I a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M37. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD,4 THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND R STRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED kt4U e-Ni1 v <br /> MLLD MANUFACTURER(s): M38. MODEL#(S): May <br /> ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40 MODEL#: Mal. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 h. M42. <br /> g gp <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mao <br /> hAmrINTEGRITY TESTING <br /> TEST FREQUENCY: 5ftZ0ft#Vffl= Elb.EVERY 3 YEARS ❑ c.OTHER(Specify) o M45 Mab. <br /> VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY- ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED•' M47. <br /> - Requires agency approval —Allo%cd for monitoring of unburied emergency generator fuel piping onh per HSC§25281.5(6)(3) <br /> PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> _Q//'NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(.,) <br /> M4R <br /> OTHER(Specify) <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />