Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — PAGE 2 <br /> VI.DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M50 <br /> �I.CONTINUOUS ELECTRONIC MONIT RING OF UNDER ISPENSER�COtNTAINMENT(UDC) 4i, n <br /> PANEL MANUFACTURER: � ��t`7L/C /U SSC.� M51 MODEL#: s�`I D �Ly�G��Z'SC M`Z <br /> LEAK SENSOR MANUFACTURER: Vta7 03r i�_— M5= MODEL#(S): M54 <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? a.YES ❑ b.NO Mss <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? (& a.YES ❑ b.NO M59 <br /> WILL FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN" gj,a.YES ❑ b.NO Mn, <br /> ;�2MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Mss MODEL#(S): M59 <br /> 2-3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Fugwssag._, pp.,an M60 <br /> .e-4.NO DISPENSERS <br /> _43"99.OTHER(Specify) M61 <br /> VII. ENHANCED LEAK DETECTION <br /> .0I.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK Mau. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) M90 <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): <br /> Mgt <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator'who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation ofthe UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): M85. <br /> OI.2�� r�D�s1JG P(es- LA CA-S A-Q0 'J,:2' � `Sb " *kI- <br /> S��u scvZ_ 446)t� <br /> No C-04 <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNA'T'URE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR SIGNATURE REPRESENTING DATE: M91. <br /> � ❑Owner M90 <br /> `F1 Operator �j <br /> nry <br /> OWNER/OPERATOR YME(prin : Msz. OWNER/OPERATOR TITLE: <br /> (Agenc),Use On/y) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />