My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:44:25 PM
Creation date
5/7/2019 4:02:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISD Flow Meter Installation Guide Installation Steps-Vacuum Assist System Below Shear Valve <br /> r- — — — — — — — — — — — — — — — — — — — — — <br /> Base of dispenser cabinet <br /> ® ® Vapor return line I <br /> shear valve --————————- <br /> pedestal island I <br /> ------------------ -- <br /> oaf° At ao�o <br /> rid ° - ----- <br /> I— Q v o•`l <br /> _o�eOflgOb Q or;'4 ®—Vapor return line shear I ao co <br /> �J,0 0' �e °t/4 I valve installed as per Cl: <br /> 0,4` DQD p local code requirements. ho. � C <br /> a����o ''4 I <br /> a� ��0� 00 I 1..NPT I— — OR <br /> threaded pipe ,Mating fitting(customer supplied) <br /> 5/16 x 3/4" /1-11.5"NPT x 2"steel nipple <br /> I hex bolts w/ <br /> lock washers(typ.) Flange with 1"NPT threaded inlet(typ.) <br /> INLETJunction box <br /> — — — — / Inlet Fitter (customer <br /> supplied) <br /> I ISD Vapor s --1— 6" � / <br /> T Flow Meter Cable <br /> / I <br /> 4 (Approx.) <br /> J 1 J J <br /> _ � I <br /> Cord grip <br /> OR — - — Outlet O-ring I <br /> Seal off/ <br /> OUTLET — ^ ^ -- RR jcustomer <br /> d� d� supplied) I <br /> I End view � OL <br /> 1-11.5"NPT x 2"steel nipple <br /> Install with arrow — — I <br /> f Mating fitting(customer supplied) <br /> stamped in end f:0— <br /> pointing down / I <br /> Conduit to <br /> Threaded pipe outlet option TLS Console <br /> (see inlet detail above) <br /> I I <br /> Required'Y'fitting for <br /> introducing liquid during <br /> TP-201.4 dynamic <br /> Vapor return line backpressure test <br /> Figure 4. Example Vapor Flow Meter Installation Below Shear Valve <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.