Laserfiche WebLink
REVISIONS BY <br /> m00 <br /> E <br /> ONgOV�.EVP�/ �z am <br /> r / 'a <br /> ENRPLIL / °3 <br /> DOWNING AVE <br /> ! / <br /> CAROLYN WESTON BLVD <br /> W <br /> 5`G`K ONN CAR <br /> \/✓ W0"REAR <br /> WON AREA B <br /> \ ••�\ �an WOW,REA B <br /> MAP .S, \ •\\ '\.� WOR 0.EA 6 \ �2 ry <br /> C� WORK AREA C\ Q UUl Nom <br /> 55 <br /> WOR REAB WW �nNU <br /> Q�NU,VfQ <br /> SCOPE OF WORK <br /> PER CALIFORNIA AIR QUALM BOARD REQUIREMENTS EXISTING- \ G <br /> INSTALLATION OF HEALY.CLEAN AIR SYSTEM(CAS)AND \�f \ CANOPY O <br /> THEDER ROOT,IN LL ENTAIL THETFOLLOW ON NG WOW STICS(ISD) <br /> DTHIARE <br /> EXIISTTIN[GED \ \ V <br /> LOCATION.SEE ATTACHED LETTER IN SUBMITTAL PACKAGE O <br /> •ALSO LET IT BE KNOWN.THIS EQUIPMENT CAN BE REMOVED ON OR <br /> ABOUT DEC.2010.50 PLEASE LET THESE INSTALLATIONS AT \ \ WORK AREA A / <br /> WITHOUT <br /> BOLLARD/GUARDPOSi AND ENCLOSURE INSTALLATION <br /> A.INSTALL HEALY CLEAN AIR SEPERATOR TANK(CAS)ON s'X A• /per <br /> CONCRETE PAD PER ATTACHED WET STAMPED ENGINEERED DRAWINGS <br /> \ / <br /> l AT EACH DISPENSER,BREAKOUT GTANEXISTING LOW VOLTAGE EY'S �. N g m <br /> AND PULL NEW CABLE FROM EXISTING TANK MONITOR AND INSTALL \ / <br /> NEW IN THE <br /> ISD EQUIPMENT.THIS ELECTRICAL WORK WILL BE ' ❑a C X" <br /> DONE IN THE CLA55 1 AND DIVISION 1 AREA Of THE DISPENSER <br /> �\ \ q 2F <br /> C-AT THE EXISTING TANK MONITOR MONITOR <br /> WITH TWO ELECTRICAL V Z <br /> BOARDS AND REPROGRAM THE TANK MONITOR FOR THE NEW EQUIPMENT \ y F t Q W ZZ# <br /> a <br /> •THERE IS NO ADDED ELECTRICAL LOADS TO SUE o°0 Ki��6 <br /> av~ Q <br /> •NO EXCAVATION Of CONDUITS REQUIRED <br /> K <br /> •THESE DRAWINGS ARE PREPAIRED BY THE COMMCT00.DOING THE WORK Z <br /> 3 <br /> 0 <br /> DATE:2-6.03 <br /> SCALE:11-10- <br /> DRAWN BY:WSG <br /> 308:MANTHEY <br /> SCALE:3"=20'SHEET 1 Of 3 <br /> SITE PLAN <br />