Laserfiche WebLink
SWRCB,January 2002 Page 6 of 10 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Incon TS STS Equipment Resolution: <br /> Sump—R.P.S. Sump—P.P.S. Sump- Sump- <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 60" 64" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 22„ 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean Clean <br /> Portion of Sump Tested' Full Full <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No 11NA <br /> product and water)?* <br /> Turbine shutdown response time 2 Seconds 2 Seconds <br /> Is system programmed for fail-safe X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 11:21 11:21 <br /> Initial Reading(RI): 6.3062" 6.3528" <br /> Test End Time: 11:36 11:36 <br /> Final Reading(RF): 6.3057" 6.3521" <br /> Test Duration: 15 minutes 15 minutes <br /> Change in Reading(RF-R,): Loss.0005" Loss.0007" <br /> Pass/Fail Threshold or Criteria: Loss<.002"amass Loss<.002"amass <br /> Test Result: X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Install new SSI test boots at the ends of all of the piping runs in the sumps and UDC's <br /> Verify that they have no leaks with soapy water. Tighten all clamps on the entries including the electrical. <br /> Plug the opening in the transition boot of the rock guard. <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />