Laserfiche WebLink
SWRCB,January 2002 Page 3 of 10 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 1% Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure X Vacuum ❑Hydrostatic <br /> fl Other(Spec) <br /> "fest Equipment Used:Vacuum pump with 0-30"dial gauge Equipment Resolution: <br /> LO-Tiink to UDC 9-10 LO-UDC 9-1.0 to 7-8 LO-UDC 7-8 to 5-6 LO-UDC 5-6 to 3-4 <br /> Piping Material: Poly Poly Poly Poly <br /> Piping Manufacturer: OPW OPW OPW OPW <br /> Piping Diameter: 1.5 in. i.S in, 1.5 in. 1.5 in. <br /> Length of Piping Run: 40 ft. 20 ft. 20 fl:. 20 ft. <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Split test repair boot at Split test repair boot at Split test repair boot Split test repair boot at <br /> i i -run isolation: end of piping ruts end of piping run at end of RiRing run end of piping run <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. 15 min. 15 min. 15 min. <br /> starting test: <br /> Test Start Time; 15:30 13:25 12:10 12:10 <br /> Initial Reading(Rt): -10"hg -10"hg -10"hg -10"hg <br /> Test End Time: 16:00 13:55 12:40 12:40 <br /> Final Reading(RF): -10"hg -10"bg -10"hg -1.0"hg <br /> Test Duration: 30 min. 30 min. 30 min. 30 min. <br /> Change in.Reading(RF-Rt): No Change No Change No Change No Change <br /> Pass/Fail Threshold or No change=pass No change=pass No change=pa-as No change=pass <br /> Criteria: <br /> Test Result: X Pass 0 Fail X Pass ❑Fail X Pass ❑Fail X Pass ❑Fall <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for ailed tests} <br /> Tank to 1JDC 9-10{Fmulled new repair boots at the ends of the piping ams in both the dispenser and the tank.Had to cut approximately 3"off the rock guard as it <br /> Cntcts the UDC on the 87 to gain accmn to the vice mdary portion of the coaxial piping.This caused a overlap with the entry boot.) <br /> UAC 9-10 to 7-8(Install new repair boots at both ends of the piping runs.Also had to cut back appraximatcly 3"if rock guard in order to gain acm:4 to the existing <br /> secondary portion of the 87 coaxial piping_This caused a overlap with the test boot) <br /> UDC 9-10 to 7-8{Inustall new repair boas at both ends of the piping ams.Also had to cut back appmainnately 3"if rock guard in order to gain access to the existing <br /> secondary portion of the 87 coaxial piping.This caused a overlap with the test boat and the new rock guard termination boots} <br /> UDC 7-8 to 5-61Install new repair boots at both ends of the piping runs.Existing neck guard termination boots are in good order) <br /> UDC 5fi to 3-4(install new repair boots at bath ends of the piping runs.Also had to cut back approximtdely 3"if rock guard in oder to gain access to the existing <br /> secondaryportion of the 87&91 coaxial piping.This caused a overlap with the test boot at the 115 side on both the 87&91 seetmdarytest boots and the rock guard <br /> Termination boots.} <br /> UDC 3-4 to 1-2 (No repairs required.Passd with originat manufactured pmts.} <br />