|
STATE OF CALIFORNIA,DEPARTMENT OF TRANSPORTATION
<br /> ENCROACHMENT PERMIT GENERAL PROVISIONS 12. PERMITS FROM OTHER AGENCIES: This permit is
<br /> TR-0045 (REV.612000) invalidated if the permittee has not obtained all permits necessary
<br /> and required by law, from the Public Utilities Cortunission of the
<br /> 1. AUTHORITY: The Department's authority to issue State of California (PUC), California Occupational Safety and
<br /> encroachment permits is provided under. Div. 1, Chpt. 3,An. I, Health Administration (Cal-OSHA), or any other public agency
<br /> SecL 660 to 734 of the Streets and Highways Code. having jurisdiction.
<br /> 2. REVOCATION: Encroachment permits are revocable on five 13. PEDESTRIAN AND BICYCLIST SAFETY: A safe minimum
<br /> days notice unless otherwise stated on the permit and except as passageway of 4' (1.21 meter) shall be maintained through the
<br /> provided by law for public corporations, franchise holders, and work area at existing pedestrian or bicycle facilities. At no time
<br /> utilities. These General Provisions and the Encroachment Permit shall pedestrians be diverted onto a portion of the street used for
<br /> Utility Provisions are subject to modification or abrogation at any vehicular traffic. At locations where safe alternate passageways
<br /> time. Permittee'joint use agreements, franchise rights, reserved cannot be provided, appropriate signs and barricades shall be
<br /> rights or any other agreements for operating purposes in State installed al the limits of construction and in advance of the limits
<br /> highway right of way are exceptions to this revocation of construction at the nearest crosswalk or intersection to detour
<br /> J. DENIAL FOR NONPAYMENT OF FEES: Failure to pay pedestrians to facilities across the street.
<br /> permit fees when due can result in rejection of future applications 14. PUBLIC TRAFFIC CONTROL: As required by law, the
<br /> and denial of permits. perndttce shall provide traffic control protection warning signs,
<br /> lights, safety deices,etc.,and take all other measures necessary
<br /> 4. ASSIGNMENT:No parry other than the permittee or pernittee's for traveling publics safety. Day and night time lane closures
<br /> authorized agent is allowed to work under this permit. shall comply with the Manuals of Traffic Controls, Standard
<br /> Plans, and Standard Specifications for traffic control systems.
<br /> 5. ACCEPTANCE OF PROVISIONS:Permittee understands and These General Provisions arc not intended to impose upon the
<br /> agrees to accept these General Provisions and all attachments to perrnitme, by third parties, any duty or standard of care, greater
<br /> this permit,for any work to be performed under this permit. than or different from,as required by law.
<br /> 6. BEGINNING OF WORK: When traffic is not impacted (see 15. MINIMUM INTERFERENCE WITH TRAFFIC: Permittee
<br /> Number 35), the permittee shall notify the Department's shall plan and conduct work so as to create the least possible
<br /> representative, two (2) days before the intent to start permitted inconvenience to the traveling public; traffic shall not be
<br /> work. Permittee shall notify, the Department's Representative if unreasonably delayed.On conventional highways,permittee shall
<br /> the work is to be interrupted for a period of five(5)days or more, place properly attired fiagger(s) to stop or wam the traveling
<br /> unless otherwise agreed upon. All work shall be perforated on public in compliance with the Manual of Traffic Controls and
<br /> weekdays during regular work hours, excluding holidays, unless Instructions to Flaggrs Pamphlet.
<br /> otherwise specified in this pemdL
<br /> 16. STORAGE OF EQUIPMENT AND MATERIALS: Equipment
<br /> 7. STANDARDS OF CONSTRUCTION: All work performed and material storage in State right of way shall comply with
<br /> within highway right of way shall conform to recognized Standard Specifications, Standard Plans, and Special Provisions.
<br /> construction standards and current Department Standard Whenever the pemutme places an obstacle within 12'(3.63 m)of
<br /> Specifications, Department Standard Plans High and Low Risk the traveled way,the permitter shall place temporary railing(Type
<br /> Facility Specifications, and Utility Special Provisions. Where E)_
<br /> reference is made to "Contractor and Engineer," these are
<br /> amended to be mad as"Perrruttee and Dcparmwnt representative." 17. CARE OF DRAINAGE: Permittee shall provide alternate
<br /> drainage for any work interfering with an existing drainage
<br /> 8. PLAN CHANGES: Changes to plans,specifications,and permit facility in compliance with the Standard Specifications, Standard
<br /> provisions are not allowed without prior approval from the State Plans and/or as directed by the Department's representative-
<br /> representative.
<br /> 18. RESTORATION AND REPAIRS IN RIGHT OF WAY:
<br /> 9. INSPECTION AND APPROVAL: All work is subject to Permittee is responsible for restoration and repair of State
<br /> monitoring and inspection. Upon completion of work, permittee highway right of way resulting from permitted work(State Streets
<br /> shall request a final inspection for acceptance and approval by the and Highways Cod4 Sections 670 eL seg.).
<br /> Department. Tho local agency permittee shall not give final
<br /> construction approval to its contractor until final acceptance and 19. RIGHT OF WAY CLEAN UP: Upon completion of work,
<br /> approval by the Department is obtained. permittee shall remove and dispose of all scraps, brush, limber,
<br /> materials,etc.off the right of way.The aesthetics of the highway
<br /> 10. PERMIT AT WORKSITE: Permittee shall keep the permit shall be as it was before work started.
<br /> package or a copy thereof, at the work site and show it upon
<br /> request to any Department representative or law enforoemrnt 20. COST OF WORK: Unless stated in the permit, or a separate
<br /> officer.If the permit package is not kept and made available at the written agreement, the permittee shall bear all coves insured for
<br /> work site,the work shall be suspended. work within the State right of way and waives all claims for
<br /> U. CONFLICTING ENCROACHMENTS: Permittee shall yield indemnification or contribution from the State.
<br /> start of work to ongoing, prior authorized, work adjacent to or 21. ACTUAL COST BILLING: When specified in the permit, the
<br /> within the limits of the project site. When existing encroachments Department will bill the permitter actual costs at the currently set
<br /> conflict with new work, the permittee shall bear all cost for hourly rate for encroachment permits.
<br /> rearrangements,(e.g.,relocation,alteration,removal,etc.).
<br />
|