My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:40:56 PM
Creation date
5/7/2019 4:15:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> Pp U,LN SAN JOAQUIN COUNTY Unit Supervisors <br /> Donna K. R.E.H.S. Carl Bor man,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor Borg <br /> man, <br /> Olsen,R.E.H.S. Stockton, California 95202-2708 Mike ,R.E.H.S.,R.D.I. <br /> . Dougllasas W.Wilson,R.E.H.S. <br /> cg1FaR' P Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Robert McClellan,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 Mark Barcellos,R.E.H.S. <br /> KAREN PETRYNA <br /> SHELL OIL PRODUCTS <br /> PO BOX 7869 <br /> BURBANK CA 91510-7869 <br /> RE: SHELL SERVICE STATION SITE CODE: 1746 <br /> 880 VICTOR ROAD <br /> LODI CA 95240 <br /> WORKPLAN: Interim Remediation Work Plan DATED: June 21, 2002 <br /> PREPARED BY: Cambria Envrionmental Technology. Inc. <br /> APPROVED 1$ with Conditions (See Below) <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by : <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S <br /> 25299.37,s ubd.(c)(3).): <br /> 1) Perform a 5-day aquifer pump test (step test and a constant-rate test) using <br /> monitoring well 4 (MW-4) as extraction point. <br /> 2) Install two additional piezometers as observation points. <br /> COMMENTS AND CONDITIONS: <br /> 1) Collect groundwater samples at the start and end of the pump test,whenever the <br /> rate of extraction is changed, and periodically during the pump test for <br /> laboratory analyses in order to evaluate the sustainability of the amount of <br /> contaminates being extracted. <br /> 2) Commence proposed work by September 10,2002. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S 25299.37, <br /> subd.(C)(3).): None <br /> DATED July 10, 2002 BY 4 <br /> Cc: CRWQCB, Central Valley Region—Marty Hartzell <br /> Cc: Cambria—Aubrey K. Cool <br />
The URL can be used to link to this page
Your browser does not support the video tag.