My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2900 - Site Mitigation Program
>
PR0503634
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 4:40:56 PM
Creation date
5/7/2019 4:15:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0503634
PE
2950
FACILITY_ID
FA0005914
FACILITY_NAME
VICTOR ROAD SHELL
STREET_NUMBER
880
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905032
CURRENT_STATUS
02
SITE_LOCATION
880 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 <br /> because it was installed(2003) after the USTs were already set in place. <br /> HA'RLIN KNOLL <br /> 1868 E HAZELTON AVE. . <br /> STOCKTON, CA 95205 <br /> Office Desk:(209)468-3442 <br /> Fax: (209)468-0341 <br /> hknolt sicehd com <br /> From: Adrienne Ellsaesser [EH] <br /> Sent: Tuesday,June 05, 2012 1`.12 PM <br /> To: Harlin Knoll [EH] <br /> Cc: Nuel Henderson [EH] <br /> subject: FW: Well destructions at Shell 880 Victor Rd. <br /> Harlin, <br /> Nuel and I looked over the MW locations. We agree PI can be pressure grouted. If MW 4 was installed <br /> after the tank, then over drill it. <br /> Thanks <br /> Adrienne <br /> From: Harlin Knoll [EH] <br /> Sent: Friday, June 01, 2012 8:55 AM <br /> To: Adrienne Ellsaesser[EH] <br /> Subject: FW: Well destructions at Shell 880 Victor Rd. <br /> Adrienne, <br /> I have not issued any destruction Permits for this LOP closure yet. They (CRA) are asking to pressure <br /> t grout some of the wells near current USTs and UST piping. This is a Risk/Benefit decision, see email <br /> and pictures . How should I proceed w/their request for a variance? <br /> Harlin <br /> From: Benedict, Chris [mailto:cbenedict@craworld.com <br /> Sent: Thursday, May 31, 2012,1:40 PM <br /> To: Harlin Knoll [EH] <br /> Subject: RE: Well destructions at Shell 880 Vidor Rd.. <br /> Harlin, <br /> I was just at the site doing a utility survey/site visit and I noticed that 2 of the 3 wells(P-1 and MW-4) <br /> that were supposed to be drilled out are close to the UST pit(2 and 4 ft. away);P-1 is also tucked behind a <br /> ballard and next to the vapor recovery. Based on the proximity to the tank'pit,I'd like to ask for a <br /> variance to pressure grout those wells. I've attached a site plan and photos of those wells for reference. <br /> Thanks, <br /> Christopher J.Benedict <br /> Conestoga-Rovers&Associates,Inc. (CRA) <br /> 10969 Trade Center Drive,Suite 107 <br /> Rancho Cordova,CA 95670 <br /> l 6/22/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.