Laserfiche WebLink
C A M B R I A <br /> Report Preparation Cambria will include a discussion of over-excavation activities and <br /> sampling results in our Tank Removal Report This report will be submitted after Cambria <br /> receives all the analytical data relating to the site demolition <br /> SCHEDULE <br /> Paradiso is scheduled to begin the site demolition on April 19, 1999 <br /> If you have any questions regarding the scope of work outlined in this work plan, please call Joe <br /> Neely at (707) 935-4854 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> . 0., �4FESs10, <br /> Aubrey K Cool Q�o��4 LU,y�Fye <br /> Staff Geolo t <br /> . ..; <br /> � P10. C46725 �} <br /> Diane M Lundquist, P E T£FrIL <br /> �A <br /> Principal Engineer <br /> C46725 <br /> cc Ms Karen Petryna, Equiva Services LLC <br /> Mr Mark List, Central Valley Regional Water Quality Control Board <br /> • <br /> 240-0955 3 <br />