Laserfiche WebLink
�) FI <br /> CAMBRIA <br /> Shell and Cambria attended a meeting with SJCEHD and the Regional Water Quality Control <br /> Board (RWQCB) on July 28, 2003 During that meeting, it was decided that Shell would <br /> proceed with the proposed interim groundwater extraction (GWE) program Cambria will <br /> schedule three five-day GWE tests before the end of the calendar year The first test is scheduled <br /> for September 8 through 12, 2003 Shell will also proceed with soil vapor extraction (SVE) <br /> testing As discussed, Cambria will submit a SVE work plan by August 28, 2003 Cambria will <br /> install the SVE wells and schedule the SVE test by October 1, 2003 and submit the SVE report <br /> including conclusions and recommendations by November 15, 2003 The access issue mentioned <br /> above was also discussed dunng our meeting The RWQCB agreed to assist Shell in obtaining <br /> access to the Teresi Trucking property in order to install proposed wells MW-12 and MW-13 <br /> (Figure 3) <br /> Blaine will develop the new wells, gauge and sample all wells, and tabulate the data Cambria <br /> will prepare a site investigatton/groundwater monitoring report <br /> In our Groundwater Monitoring Report — First Quarter 2003 dated May 13, 2003, Cambria <br /> requested that total petroleum hydrocarbon as gasoline, benzene, toluene, ethylbenzene, and <br /> xylene analyses be reduced from quarterly to annually in all of the site wells As discussed with <br /> Jeffrey Wong of SJCEHD during an August 11, 2003 telephone discussion, SJCEHD will review <br /> this request <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510)420-3336 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> O'�< <br /> Anne Wettstone <br /> Staff Geologist <br /> D GEG� <br /> Joe W Neely, RG <br /> Senior Project Geologist No 6927 <br /> RG 6927 <br /> 9 t� R�~P <br /> OF Cgl.1CA <br /> 0955 2 <br />