C A M B R I A <br /> same event, TAME was detected in wells MW-I and MW-4 at concentrations of 34 and 4 0 ppb, <br /> respectively TPHg, benzene, toluene, ethylbenzene, and xylenes (BTEX) were not detected, <br /> although some reporting hrruts were elevated <br /> Based on the analytical results from the CPT borings, SJCEHD requested submittal of a work <br /> plan for further assessment of the lateral and vertical extent of gasoline constituents in <br /> groundwater beneath the site and interim groundwater remediation Cambria subrrutted work <br /> plans on June 5, 2002 and June 21, 2002 and the results of this work are presented below <br /> RESPONSE TO SJCEHD LETTERS <br /> 8260 Peaks Report <br /> In correspondence dated July 22, 2002, SJCEHD requested that Shell "conduct a full 8260B scan <br /> and report all peaks for one quarter sampling event annually to monitor for degradation products <br /> of oxygenate compounds " Shell and Cambria are in the process of discussing this request with <br /> the RWQCB Once the matter is resolved, we will discuss this request further with SJCEHD <br /> • Deep Well Installation <br /> In their June 25,2002 letter, SJCEHD approved Cambria's June 5, 2002 Site Investigation Work <br /> Plan and requested the installation of one deep groundwater monitoring well Cambria <br /> responded in our July 24, 2002 Groundwater Monitoring Report — Second Quarter 2002, <br /> concurring that additional deep groundwater sampling is warranted At that time Cambria stated <br /> that we would like to further assess the lateral of extent of the groundwater plume prior to <br /> choosing a location for a deep groundwater monitoring well We also stated that we would <br /> propose a deep groundwater monitoring well in the site investigation report following the <br /> shallow well installations <br /> In correspondence dated October 28, 2002, SJCEHD approves Cambria's request However, the <br /> letter also requests that the deep well be installed no later than January 1, 2003, which does not <br /> allow enough time for a work plan to be submitted and approved, pnor to the well installation <br /> The work plan, proposing a deep monitoring well and discussing the proposed drilling schedule, <br /> is presented below Shell would like to install this well at the same time as the proposed offsite <br /> wells discussed below,and will make every effort to schedule the drilling as soon as possible <br /> • <br /> 0955 4 <br />