My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
3500 - Local Oversight Program
>
PR0544434
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 9:55:24 AM
Creation date
5/8/2019 9:48:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544434
PE
3528
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
02
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> Dust and noise will not be a problem while completing this project. The entire j <br /> treatment or mixing operation will be accomplished in one or two 'days. The mixer is run <br /> by a hydraulic pump, powered by a small muffled diesel motor. None of the equipment <br /> to be utilized will exceed the noise level of equipment normally used in the area. The <br /> material to be treated has been covered since shortly after it was excavated and is moist, <br /> therefore, dust from loading the material should not be a problem.; Material discharged <br /> from the mixer is very moist and will not be dusty. The mixing process takes place <br />} inside a steel-drum mixer closed at both ends. Very little dust can 1.escape the enclosed <br /> drum. <br /> �P <br /> 13. Soil Sampling: Soil sampling will be accomplished by 'retrieving samples from the <br /> appropriate areas of the piles with a shovel or other tool. Samples" will be composited ! <br /> from four locations around each sampling area. Sample areas will be equidistant along <br /> the length and width of the piles. Locations of the samples!may change at the direction <br /> I of SJPHD/EHD representative on site. All samples will be taken and transported <br /> utilizing the proper containers by Foothill Engineering representatives on-site according <br /> to LUFT guidelines. Samples will be tested for B.E.T.& X and TPH for diesel and <br /> gasoline. <br /> 0 <br /> 14. Work Schedule: Work can begin as soon as SJPHS/EHD approves this work plan. <br /> Soil samples can be taken within 30 days of completion of the mixing process. Sample <br /> I analyses results should be ready for review within 5 days of'Fcollecftion and will be <br /> included in the final report. A decision as to the disposistion of the soil will be made <br /> upon verification of successful treatment. +i <br /> 15. Health and Safety Plan: Attached. Respectfully submitted, <br /> JIM THORPE OIL, INC. <br /> dba RICH-MART CONSTRUCTION <br /> f <br /> LA—Richard Thorpe, President <br /> Foothill Engineering , Ervin Rifenburg <br /> RCE 1975 oQ °Na P <br /> <�� RIFEyBG !F2 <br /> o No. 197 <br /> Exp. <br /> L P <br /> SOF CAL1E��� ;k <br /> I <br /> �j <br />� f <br /> k <br /> -3- f <br /> P <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.