Laserfiche WebLink
10/15/01 14:03 FAX 209 942 0"14 Siegfried Eng Z005 <br /> Piping (cross-sectional di ✓,m, including connections to tank and disp•,` <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(CA, or <br /> (B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) X suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)) <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) 4— corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of: secondary pipeVault or <br /> Lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used-as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary'containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: V i,CGIti no -t Model: 'i 16- <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test wilt not be required if the continuous monitor shuts down the pump and <br /> activates.1 alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. / State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. T Plan review and operating permit fees paid. <br /> 22, What is the approximate depth to ground water: _ ^ 1 - ZC7 <br /> ILL (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) <br /> Pinj u'pn1 t r �� l�nno �,P-A hr6rvI iIahpy1vn 5'lYl.C-f <br /> 23. Total number of tanks on site after installation: '30 421) <br /> 24. County/City fire District and Building Department notified. <br /> 25. in the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PNS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation act'ivi'ties. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator must ackriou`ledge this responsibility for workplan submittal by signature and date below. ;. <br /> Name Title Date <br /> CONDITIONS Of APPROVAL: <br /> g <br />