My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
INSTALL 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:38:25 AM
Creation date
5/8/2019 11:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCUIT MANAGER <br /> THE PROBLEM <br /> • Electrical panels and controls are difficult to install and startup <br /> causing damage to equipment and delays in store opening schedules. <br /> • Valuable wall space is taken up by the electrical panels and controls. <br /> _ Outdoor lighting problems and delays during startup/operation. <br /> • Dispenser/Pump problems and delays during startup/operation. <br /> • Computer/Console problems and delays during startup/operation. <br /> • No consistency from site to site makes electrical troubleshooting difficult. <br /> • Loss of Revenue and Opportunity Cost. <br /> THE CAUSE <br /> • Increased complexity of equipment and technical requirements. <br /> • More wall space is required for increased electrical distribution and <br /> control requirements. <br /> Field installed controls for critical Dispenser/Pump, lighting, and computer <br /> systems are not coordinated properly and vary with each electrical contractor. <br /> • High maintenance costs and downtime. <br /> MEMBER <br /> �PE1= <br /> �fUM FQFfMF1 MS` <br /> THE SOLUTION <br /> W.A. Brown's - Circuit Manager <br /> • Provides electrical subpanels, breakers, and controls are all pre-wired. <br /> • Provides critical wall space savings. <br /> • Provides all the benefits of the W.A. Brown "Lighting Manager", <br /> "Dispenser Manager", and "Power Manager" systems. <br /> • Provides complete electrical/control system in a single enclosure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.