My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
INSTALL 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:38:25 AM
Creation date
5/8/2019 11:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/01/02 14:40 FAX 209 942 0214 Siegfried Eng Z003 <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4, Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) 8 26351 <br /> g, X Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10- At the installation site, prior to Installation, a tightness test shad be performed on both primary (1°) and <br /> secondary (e) containment systems before covering. [Section 2635 (a) (3) & (4)] <br /> 11. Tank Integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PNS-EHD from the testing company or owner of facility. [Health L Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK 9 <br /> CAPACITY- iG O 12 <br /> MANUFACTURER <br /> COMPOSITION IU S_ + V►1G <br /> MODEL / <br /> PRODUCT f Yll� <br /> CORROSION PROTECTION I <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL 5 <br /> 13. TAMK(s) TO BE INSTALLED <br /> A. Steel-cted with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector_ <br /> (2) vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C_ Non-clad steel tank [Section 2635 (a) (2) (A)3 <br /> (1) rathadiu protectinn provided for entire tank, piping and compnnents (nuts, bolts, washers <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> coerosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.