Laserfiche WebLink
i { <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. _ Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. _�/ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. _2� Tank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> g, Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> F # # 0 <br /> Y 14JOD(7TURER Lfts i- <br /> ITION IRSfid AION PROTECTION IbzoISTEDIBILITY WITH 100% <br /> OL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector_ <br /> (2) Vacuum applied to interstitial space. <br /> _ a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation <br /> (2) vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> _ C. Non-clad steel tank (Section 2635 (a) (2) (A)] <br /> _ (1) Cathodir protectinn provided for entire tank, piping and rcxnponents (nuts, bolts, washer <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />