Laserfiche WebLink
3. Description of work to be corn, ped: <br />Addition on existing canopy 26' x 24' and fueling island addition to increase <br />fueling dispensers by one, 2 fueling points 4rLA aAdj-tgKn4 se01,4 trâ–º <br />4. Description of equipment to be used: <br />1 --- Wayne V590- 3 Product, 2 Hose Dispenser <br />1 Environ 2816-2 Dispenser Pan with Safety Valve, Stainless Flex Connector <br />_ VeederRoot 794380-208 Liquid Sensor <br />26' Environ GeoFlex Double Wall Product Piping and Geo Dust and Fittings <br />5. All equipment is State certified or approved. YES NO [1 <br />6. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? YES[] N04] <br />b. Identify contractor performing decontamination: (No Piping Will Be Removed) <br />Name Phone{____.__) <br />Address City Zip <br />2 <br />