Laserfiche WebLink
08/07/2002 14: 4b 20y4btiJ4JJ rlr ir7 rL-uun <br />WRITTEN MONITORING AND RESPONSE klt-AN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder mist notify Environmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before making <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME G Iq S - � - � e S S DATE C,13- -(Z -o Z <br />FACILITY ADDRESS 3 Y 3 �( ��N TA ey r-,=,/, Sfo c %nl C7JIT <br />"d 9 S 7� 7— <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />Ne�) AN1/Pr5oN - 5f6re 1)(C-ecfor <br />2 -Describe the frequency of performing the monitoring for: <br />TANKS C61Jf1t406U5 PIPING Ce*1N4<NdU S <br />3.Describe the location(s) of where the monitoring will be performed_ ie; location of sensors <br />'_lAw k A ra L -til A, �;44r S <br />4.Describe the following equipment for each underground storage tank <br />Name and Model of Monitoring Panel (%,-_-eZ-e Ir 20©l 7 - <br />Name <br />Name and Model of bine Leak Detectorsyke p nRn3c�7 (O <br />Name and Model of Annular Sensors ��edP C Y FJf1r- 7 9 y3 / a y?-� <br />Name and Model of Piping Sensors f 'iZWT 1 7n��j0 - Z ©g <br />Name and Model of Dispenser Sensors kj-ee f p`I � <br />of kmT 7 [ 3 - Z_ <br />Type of overfill prevention 1 f BCCIf 1 o CQT- 7 9 17'71 ^tn I <br />S.Do the Turbinc Sensors and Dispenser Pan Sensors shut down the turbine? Yes 1s No ❑ <br />Does the turbine shut down if a sensor is disconnected? Yes i$ No ❑ <br />Does the turbine shut down is the monitoring panel loses power? Yes ig. No ❑ <br />6. How will the alarm history and subsequent maintenance be recorded? <br />�eec(fr RncrF TGS-1550 Altar -,00'75 <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? JU(y <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary contairunent systems <br />must be tested once every 36 months with initial iestingperformed before January 1, 2003. <br />S. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. S 14t'et d S N a e jpe(- I q r— <br />>t <br />1:\mstern -le\UST\monitoringplan.doc Post -it` Fax Note 7671 Date <br />7119(20U2 <br />To� 11L__1� S14V From <br />cojDept. o od 4 LE' S S co. * L <br />Phone n Phone N i <br />Faz M Q, a- 9 2 6 Fax k <br />