Laserfiche WebLink
F. In -Tank Gauging /SIR Equips ,,,nt: <br />C7 Check this box if tank gauging is used only for inventory control, <br />Q Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com Tete the- followin checklist - <br />yes ❑ No* �as all Innenit i,4!� a I--:-irspec,4 <br />dpperenryantermination, including testing for ground faults? <br />Yes © NO* Were all tank gauging probes visually inspected for damage and residue buildup? <br />� Yes Cl No* Was accuracy Orsystcm product, revel readings tested% <br />Yes ❑ No* Was accuracy of system a Iter level readings testcd? <br />Yes ❑ No• Were all probes reinstalled properly? <br />Yes ❑ Not Were all items on the equipment manufacturer's maintenance checklist completed? <br />* <br />In the Section H, below, describe how and when these deficiencies were or will be corrected, <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs arc not installed, <br />Com fete the followin checklist: <br />YesFor equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak ratc:,d3Jr.• ❑ 0.I <br />g•P� g.p.h ; ❑ 0.2 g.p.h. <br />a. Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />a.. Yes ❑ No* Was the testing apparatus properly calibrated? <br />1 Yes ❑ No* rFor mechanical LLDs, docs the LLD restrict product flow if it detects a leak? <br />lZ N/A <br />A- Yes ❑ No* For.electronic LLUs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ NIA <br />I Yes ❑ No* For electronic LLDs, does the turbine a:ttomatically shut oft if any portion of the monitoring system is disab <br />❑ N/A or disconnected? led <br />I Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system Malfunctions <br />❑ N/A or fails a test? <br />I Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />I Yes Q No* Were all items on the equipment -manufacturer's maintenance checklist completed? <br />In the Section H, belofv, describe how artd ►vhcn these derciencies were or will be corrected. <br />. comments: <br />03fo1 <br />