IRRIGATION IFI I
<br /> SPECIFICATIONSLANDSCAPE MAINTENANCE
<br /> LN ETIAL
<br /> FFt_.. GEN
<br /> . _a._.
<br /> 1,01 DESCRIPTION 3.01 CONDITIONS AND MEASUREMENT 1,01 DESCRIPTION
<br /> 1,01 WORK SPECIFIED
<br /> A, Work included: Provide all Mellor, materials, tools, eg6P ntent, transportation, A. Prior to commencing the Work included in this Section, the Contractor shall A. Work included: Provide all labor,materials,tools, equipment,transportation, B. Tree and Shrub Planting:
<br /> and services necessary to Install the landscaping as required by tete carefully exarnirre the work of other trades and verity that all such work is and services necessary to Install the landscaping as required b the A. Watering, ntaw(rtg ails trirrtrTting, weeding and PErtifizln of tori; wEedir,q
<br /> Dtawin s and Specifications; includirt but riot necessarily limited to: the p 13 g y 1. Planting layout shall be in accordance with tete fOrawings° arid cultivation of other plant areas. Adjustment and repair of krigatiort
<br /> g P g y sufficiently complete so filet the irrigation system may be installed in Drawings and Specifications; including, but not necessarily limited to: the
<br /> excavation, backfilling, and compaction of trenches; Assembly of and testing complete accordance with the Drawings and Specifications. in the event of renovation and removal of oxistin landscape materials; placement, system and clean tip,
<br /> r g p p 2. Mark plant locations and secure approval of the Landscape Architect
<br /> Of system; submittals and permits as required; cleanup; and any other items discrepancy, notify the Landscape Architect arid proceed as directed, preparation, and fine grading of topsoil; redwood headerboard or concrete beforel<antin q pp
<br /> as Indicated on the Pians and/or herein specified, mow bands; planting, staking, and fertilizing of trees, shrubs, groundcover P g• Submit request for approval 46 hours in advance, 1.02 RELATED WORK
<br /> B. Review site conditions and verify that the Irrigation system will provide and turf; clesam p; and/or as herein specified. 3. Prepare plant pits In accordance with the Drawings. Backfill partially with A, Landscape litigation
<br /> P, Related Work: adequate coverage as intended, Notify the Landscape Architect in the event f g
<br /> the prepared
<br /> of discrepancies so that they may be reviewed arid design clhanges made B. Related work: Landscape irrigation backfill mix And add planting tablets At a rate of:
<br /> 5 B, landscape Planting
<br /> t, Landscape Planting. As rrtigPtt be necessary. 5 tablets per iS gat plant
<br /> 3 tablets per 5 gal plant 1.0,E DURATION
<br /> 1 tablet per f gal plant
<br /> 1.02 GENERAL NOTES 3,02 INSTALLATION AND WORKMANSHIPj .Gt A. The maintenance period shall be for a period of ( 90 ) calendair days
<br /> 4. install plastic deep watering pipes next to all trees in Accordance with the beginning with approval of the preliminary pts-maintenance inspection,
<br /> A, Brands of Irrigation equipment have been selected by the Landscape A. Excavation arid backfill: 2.01 PLANT MATERIALS Tree Planting Detail As Indicated on the Drawings,
<br /> Architect to meet certain requirements, one of the primary being that all 1. Provide all excavation and trenching necessary for the exectution of Work 5, install a two (2) Inch layer of wood chip mulch in the watering basins of
<br /> rnateilal brands used on this Work shall be available from three or more Included in this Section. A. Nursery Stock:
<br /> distributors with branch outlets in the count of the Project and within 4 s All flocs and shrubs not In tete press Areas as indicated by tete details
<br /> y 1 1, Plant sizes shall be as shown on the Drawings and shall meet the art tete Drawings, W T �Q CTS
<br /> minutes normal driving time. 2, The Contractor shall verify with tine appropriate Agencies a,s required to minimum standards established by tire California Nurseryman's 2.01 GENERAL
<br /> determine locations of existing underground facilities. Tho Contractor Association, All plants shall be number 1 grade, fresh, vigorous, of 6. All trees shall be securely staked with double slakes, drivers vertically 2'
<br /> B. Record Drawings: During the course of construction tete Contractor shall shall be responsible for any existing facilities, pipes, or lines in the work normal growth; free from disease, Insects, Insect eggs or larvae, scars, Into orifi ground, Trees shall be fastened In two or mar® places will, A. The Contractor carefully record all deviations from the irrigation Pians on reverse sepias area. or IrtjUred bark. rubber tree ties, Walled in a figure '9' fashion, w{iPt team allowed far two Cat actor may elect to use herbicides or pesticides during planting
<br /> reserved As a record set, Changes to piping layout shall be documented g or maintenance procedures. It lois is done, the selection arid use of the
<br /> years growth. Staking shall be done immediately after planting And trees materials is solely the responsibility of the Contractor arid shall be ire
<br /> to Astabiisl, reference points. Specific Items to be recorded shelf Include, 3. Backfill shall be free horn rubble and debris, fine granular material, 2, A,li nursery stock shall be correctly labeled, in accordance with the State Shall stand lamb Ahor staking, •
<br /> but not be Illnited to: valves of all types, piping,, s rinkler heads and control Installed, compacted, and graded to conform with the D�fawin s arid re.Uitsnienls, before delivery to the Work site. p g accordance with rules of governing agencies,
<br /> Yfa p p q p Fa g g q •
<br /> wiring. The record drawings shall became property of the Owner upon Speclfications' C. :raundoov®r Planting: 2.02' MATERIALScompletion of the Project. 3, Ail plants are to be of a size normally associated with the container t, Prepare soil In accordance with the Specifications,
<br /> 4, Settling of backfilled trenches, which may occur during a one (1) year specified, Do not prune except under the direction of the Architect,
<br /> C, Operations Manual: Upon completion of the litigation system, arid as a period after acceptance of tike irrigatior, system, shall be repaired ade soil to oanfartt, with grading requirements. A. Fertilizer - granufar commercial fertilizer 16-6-8 plus trace elort, , is,
<br /> condition of its acceptance, deliver to ilia Owner two capias of a manual including restoration of any or all damaged planting, paviing, or other 4. Plant Materials are subject to inspEotian and approval, or rejection, on 2, Rake and fine gr, B
<br /> Sad . !n accordance with the Landscape Planting Specifications,
<br /> oorP7Faile in accordance with ills specifications, Including capias of the Improvements; by tfte Contractor at no Additional cost to the Owner, the site at any time by the Architect for size, variety, condition, latent 3. Apply slow release fertilizer at tete rate of 10 pounds part square
<br /> Recotd Drawings referenced above. defects, or injuries. Rejected plant materials shall be immediately feet,
<br /> B. Piping
<br /> C). Guarantee; Contractor shall submit to the owner, A written guarantee t. Piping layout shall be in accordance with tile Drawings, reproved from the site arid replaced.
<br /> covering the entire irrigation system against defects In materials arid 4. Water area lightly to moisten the soil prior to planting as necessary to j Alf! 3 q!L1I ?N
<br /> 5, Protect plant materials iron, adverse weather conditions at all times prior thoroughly soak the sail, but not sufficiently to cause erasion, Water
<br /> Instillation for a parted of erre (1) year from floes date of acceptance of this 2. Carefully inspect all pipe and fittings before Installation, refrtt(ave all dirt, to planting, flats of groundcover one I hour before planting.Work by the Landscape Architect. Written guarantee cards for the luigatlon scale and burrs, and rears, as necessary. g ( ) P 9• 3.01 GENERAL
<br /> controller, arid other equipment requiring registration, shall be included and 6. Quantities shall be furnished to complete ti,e work. Plant legend 5. Groundoovers shall be
<br /> attached with the Contractor's guarantee. 3, Where not indicated on the Drawings and Details, minimum soil cover quantities are for the Contractor's convenience only, planted from rested flats In conformance with the A. Teta entire site stall be rttaintafrtEd In a proper arid orderly fasft{on,
<br /> spacing as called for on the Drawings In evenly spaced rows Areas shall be protected front damage, Including erosion and trespass.
<br /> shaft be 12"for nonpressure laterals and td3"far pressure mrains and low incorporating staggered or triangular spacing, Walks, sued areas, structures and
<br /> voltage electrical wires. 7. Plant materia{ substitutions will not be permitted unless specifically p equipment shall be maintained in
<br /> Approved by the Landscape Architect, geed repair and kept tree of debris,
<br /> 6. immediately treat all groundcover areas with the pre emergent herbicide
<br /> �' �- - ---E'�����!_-�-�_ 4. Exercise caro in hartdling,foadirtg, shipping,unloading and sttarirtg plastic as recommended by the Pest Control Advisor, Apply In accordance with 3.02 {RIZIGAtIC3N SYSTEM
<br /> pipe and fittings, 13. Groundcovers: the Advisor's directions.
<br /> MATERIALS t. Groundcovers shall be as noted on the Drawings and shall be well
<br /> 5.
<br /> A, Plastic Pipe: Repair any dented, cracked, or damaged pipe by cuttling out the rooted arid established In flats, and shall have been hardened off for a D. Sod Lawn Planting: A, Piping, equipment and appurtenances shall be adjusted, cleaned and
<br /> damages section and rejoining with a coupling, minimum period of thirty (30) days before shipping to the Work site, maintained In proper working order. Defects shall be corrected arid
<br /> 1. All plastic pipe shall be flew, free from defects, continuously and I. Ball, scarify, rake, and fine grade as necessary to obtain a true and even
<br /> termanentl marked with the following information: orreplac, faulty of messing materiae arts equipment sP,aPl be repotted
<br /> fawn bed surface. Finish grade shaft be one (i) inch below tap of or replaced at the Contractor's expense.
<br /> 1 Y 9 6. Plastic joints: Use the specified printer and solvent, making) all joints in C. Sod: and headerboards in sad areas.
<br /> accordance with the manufacturer's recommended methods, Allow at 1. Sod shall be freshly cut, protected until Installed, and installed within curbs, walks, mow strips, B. Controllers shall be adjusted r
<br /> h-lartufacturer's name, pipe size, IFIS size (Schedule feast 15 minutes set-up time for solvent welded joints before pressurizing 46 hours after harvest cutting. 2. Fertilize even) with ranular fertilizer at a tate of ten 10 j periodically for uniform and proper water
<br /> number), type of materials, And code number, pipe with water. y 9 ( ) pounds per application to establish plant materials arid turf,
<br /> 1000 square feet.
<br /> 2, Pressure Mainlines shall be PVC 1120.1220, NSF polyvinyl 7. Plastic to steel joints: Work all steel and threaded joints firmt. Use joint 2.02 SPOIL AMENDMENTS, FEf1TILiZEFiS, AND HEnsicIDES 3.03 LAWN
<br /> chloride, pressure rated rninirTtirrn Schedule 40, meetingcompound on all threaded plastic to steel join3. install sod fawn In accordance with the Grower's published specifications.
<br /> s. Tfghtern with tight A. lawn areas shall be rt,aintarnad at a cottstartt moisture depth of 9".'
<br /> ASTM D•2241, solvent weld, wrench pressure. Do not over-tighten, A. Soli Amendments: 4. noli lightly and thoroughly water Immediate) after Installing,
<br /> 3, Non-pressure Lateral lines shall be PVC 1120.1220, NSFpolyvinyl 1, Compost shall be nitrified redwood or cedar compost. 9 y 9 y y g Hand watering shall be pra;,ticed, IF necessary, to maintain moisture
<br /> Non-pressure €t. Steel to steel Joints: Work all steel joints first, tJsE joint oar,tFaound on all depot,
<br /> chloride, pressure rated minirnurn Class 200, solvent weld. threads, tighten with pipe wrench. B. Fertilizers: . Stark Mulch:
<br /> 1, Install and spread bark mulch evenly in all planting areas to a minimum B. Lawn shall be mowed as specified heteln, Clippings and debris shall
<br /> t. Planting tablets shall be °manufactured
<br /> slaw teleost planting tablets (20-110-5), depth of two (2) inches, be removed front Ilia site, Lawn shall be trimmed at the edges of curbs
<br /> f3. Plastic fittings and nipples: C. Backflow prevention: . 29•grant tablet size, as manufaoturEd by Sierra Chemical CarT,pany® or
<br /> 1. All fittings shall be type 1.11, NSF polyvinyl chloride, n,inftturT, Schedule 1. Install the backflow prevention device as Indicated by Detail on the equal approved by the Landscape Architect, arid paving, g
<br /> 40, solvent weed, ASTM U•2466.74A & C3.1784.75 Drawings and in oorthplfartoo wRft State arid Local plumbing sodas,
<br /> 2. Granular fertilizer shall be 'Best Turf Supreme' peileted fertilizer 3.03 INSPECTION ANO ACCEPTANCE FOR SUBSTANTIAL COMPLETION C, lawn Areas which die or fall to beoorrta established Strait be re-sodded
<br /> (16 6 !)
<br /> 2. PVC pipe nipples shall be type 1-I1, NSF polyvinyl chloride, minirnurn IF'S D, Remote Control Valves: as manufactured by (Occidental Chemical Company, or equal approvedat maximurn 10-day intervals until a vigorous, lush stand of turf is
<br /> Schedule 60, ASTM 1765, die threaded at both ends. 1. Remote control valves shall be installed as indicated by Diotail on the by the Landscape Architect, A. Maintenance: established,
<br /> Drawings.
<br /> C. PVC Solvent, Primer And Lubricant: 3. Slow release fertilizer shall be Agriinrm 16-7°12 (+iron) as manufactured
<br /> I. Perform all maintenance operations as necessary until the Work is D. Lawtt areas shall be kept free of'Needs, Maintenance shall also Include
<br /> 1. Use only A plastic pipe solvent approved by NSF and UPC, 2, A valve box shall be installed for each valve as shown, with gravel by Sierra Chemical Company, or equal approved by the Landscape completed and Final Inspection and acceptance has been made by the treatment for fungus, disease, rodents arid Insects.
<br /> ASTMD•2564.66t, and As rocommended for use by the manufacturer of Installed underr,riallt site+ valva. Top of box shall conform with Architect, Landscape Architect. _
<br /> the plastic pipe. 8�.,, auneirg grade otter settlement. E. Flacks, clods and debris',,,h!ch appear on the surface shall be removed,
<br /> C, Herbicides:
<br /> B. Inspection: [leaved, settled or eroded ateas shall be restored by excavating, filling,
<br /> 2. Use only ptaslic; pipe pruner approved by NSF and UPC, and as E. Automatic Controller.and Low Voltage Wiring: 1, Pre-emergent herbicide, granular or liquid, as recommended for this finish grading, rolling arid re- sodding as required.
<br /> recommended lot use by ntartufaclUrar Of the plastic pipe, t. Coordinate 120V povear connection with electrician for installing tite project by a Registered Pest Control Advisor for use in all planting areas 1. Contractor shall request an inspection when the work has been
<br /> contptoted In accordance with the Drawings and these Specifications, in F, Lawn shall be mowed For ttio first tittle after the establishment of a
<br /> controller aI this location as shaver, on the Drawings. exclusive of turf or seeded areas. order to establish the dates of Substantia! Completion (starting date for vigorous, uniform stand of ILA wh{cit has reached a height of 3". Lawn
<br /> 3. All cans shall have labels intact arts slart,f7eci with the date of g
<br /> ntaruafaclure. No cans dated one year old wilbe permitted. 2. Sprinkler controller charts, consisting of reduced (photostatic
<br /> CO. Wood chip mulch: maintenance and warrantee period) and for the Final Inspection. shall be mowed a second time when it again reaches a 3"height except
<br /> reproductions of the F;ecord irrigation Plans, shall be laminated In plastic MUlch shall consist of standard size clean, 1/4 inch to t Inch In size, that the second cutting shall be performed no sooner than ten days
<br /> D. Galvanizedripe
<br /> n Pipe, Fillings and Joint campounct: and mounted Inside the controller cover, mill-tun wood chis as manufactured b Sequoia Forest Products, Of 2. Prior to the inspection, thorough) weed and rake all plantingareas, after Ilia first, Mowing shall take lace thereafter as required for a neat
<br /> t. Pipe nipples shall be dorttestio t,ot di1.a galvanized steel pipe, NSP Approved equal, p y q rs-plumb all tree stakes, mow arid edge lawns, sweeappearance,
<br /> p
<br /> Schedule 40, thteAded both ends, Arid reamed with burrs arid scala 1 0 pup and wast, pp
<br /> 3. Low voltage wiring sttatl have'A minimum soil cover of 24", or be installed down as required, and generally put the completed Areas Into a neat,
<br /> removed, complying with the rectulteniants of ASTM A-120.64 or ASTM in appropriate conduit, with all splices made in boxes, using the clean, orderly condition, G. Ferillize all tLIa areas with commercial femlilzer at the rate of 15 pounds
<br /> A-53-67. manufacturer'subiished directions,
<br /> p 2.03 PLANT STAKING MATEP-ilAt.s per 1,000 SgUaPE leEl Alter IP1Q ascend Ct,rfIiP,g arid tlterlCE forth at alxtt
<br /> 2, Fittings shall be domestic galvanized Iron, NSI' Schedule 40, threaded, day intervals until ffte end of maintenance period, Water thoroughly
<br /> pf
<br /> F. Sprinkler heads: 3.04 WARRANTEE AND REPLACEMENT after fertilizer A alicat{on,
<br /> with burrs and scale removed. A. Tree Stakes:
<br /> 1, Sprinkler heads shall be the types as indicated on the Drawings. 1. Stakes shall be 2^ minimum diameter by 10' Fong, new, ladgepolo pine
<br /> Provide full or part circle patterns as required to properly ItIrrigate the tree stakes, A. Warrantee: 3,04 SHRUBS, -TREES AND GROUND COVEn
<br /> 3, Joint compound for all threaded connections shall be Rector Seal or pointed at one end and chamfered at the other.
<br /> p guarantee that all trees and shrubs A. Areas shall be maintained in a moist condition for the duration of the
<br /> Irtiertcfo areas, I. Tho Contractor shall revise a
<br /> Approved equal, B. Tree ties: planed under this Specification shall be in good, healthy, arid vigorous
<br /> 2. Install sprinkler heads in accordance with Details on the Drawvings, 1, Tree ties shall be sturdy rubber tire condition of active growth at the and of Ninety (90) calendar days from maintenance period,
<br /> E. Backflow Prevention: y type, without wits, length as the date of Substantial Completion, '
<br /> 1. Backflow prevention device shall be as indicated on the Drawings or required, as manufactured by Gro Strait Products, or equal as approved p
<br /> r 3. Astor installation, thoroughly clean and adjust all nozzles and) hoods for by the Landscape Architect. B• Areas shall be kept weed flee,
<br /> Approved oved oqual, mounting height and clearances, plus direction and distance? of nozzle B. Replacement:
<br /> throw, for adequate coverage of areas as Intended. 2,04 PLANTING Mix I. Replace, without cost to the Owner, as soon as conditions permit, all C• Plant material indicating weakness or probability of dying shalt be
<br /> 2, Backflow prevention device shall be capable of being inspected, tested, dead plants, And plants not in a vigorous, thriving condition as replaced p with slittllar rttaterial by
<br /> the Contractor at his own expense,
<br /> and repaired without removing the unit frorTt the find. A. Planting backfill mix for planting of all trees arid shrubs shall consist of the determined by the Landscape Architect,
<br /> 3.03 TESTS following D. Tree stakes or straps F, Automatic Irrigatior, Controller: g per cubic yard: F s wftictt for any reason are damaged or rendered
<br /> 1. The irrigation controller shall be of Manufacturer, number of control 751a clean on-site topsoil 2, All plants shall be free of dead branches and branch tips, and have Inadequate for support shall be repaired or replaced by the Contractor
<br /> A. Test each irrigation system for pressure leakage, before backfillirng, for a 25% compost foliage of normal density, size, Arad calor. st his expense,
<br /> stations, and type As Indicated on the Drawings. minimum period of two (2) hours at 1001 PSI. System pressiure piping 20N granular fertilizer
<br /> G, Automatic Control Valves:
<br /> Assembly Is acceptable it no leakage or pressure tests before baackfillin . 3. Replacements shall continue to be made until each plant has E, Constant diligence shall be maintained for tfte advent of disease,Insects
<br /> 1. Electric control valves shall be 24V electric solenoid, diaphragm type, asB. Planting backfill shall be thoroughly mixed onsite and stockpiled for planting successfully established Itself, and Infestations and proper preventative or control measutes takers.
<br /> B. TT1e Contractor shall not allow or cause any of the Work of this Section to operations, F. Fertilize each tree and shrub with commercial fertilizer At the end of 90-
<br /> hhciicatod on the Drawings, or approved squat. be covered a ar enclosed until It has been Inspected,tested ands approved p p � pp 3.05 MAINTENANCE SERVICE days and Agalr, every AO-days As Follows: .
<br /> 2, Valve IPS shall be as Indicated for each valve location, by the Landscape Architect,
<br /> 2.04 OTHER MATERIALS 1. 15 gallon size 4 1 pint
<br /> C. The Contractor shall provide all materials and labor, Including alt least two A. Begin maintenance of all landscaping immediately after planting and continue 2, gallon size - 1/2 pint
<br /> It. Low Voltage Wire and Cannectall for ( 90 ) calendar days after date of Substantial Completion, 3, 1 gallon size a/1 pint
<br /> accurate pressure gauges for each system being tested. A. All other rttalerfafs, riot specifically described, but required for a complete 1. Low voltage central wird shall be UL•UF, direct burial, PVC cased wire G. FoPtilize ro
<br /> (UF #12 ceded white for common Ancf OF 14 ceded red or black for to�erappravlalrtaf plantinginstallation,
<br /> Lalndspra ePtAr all boeselected by the Contractor subject B, Maintenance shall Include all measures necessary to establish and maintain and cover with commercial fertilizer at the erid of 90•days
<br /> control.) 3.04 INSPECTION AND SUSIAIT TALS approval p planting In a vigorous Arid healthy growing condition • See Maintenance and thence totih every 90-days at a rate of 115-pounds per 1,0300 square
<br /> 2, Control wire connectors shall be Snap•tite ST-03 with PVC sealant, UL A. Final Inspection: Specification, lost.
<br /> approved for water resislant PVC Insulaled copper wires, 1. Tborau hl clean, adjust, and balance all systems. Demornstrater the T 3.05 PAVED AREAS AND CLEAN 11P
<br /> g y I y .�.� �i1Q� 3.06 FINAL INSPECTION F���'BBN °
<br /> entire system to the Landscape Architect showing that all heads are A, All walks attd paved areas shall be kept clear of debris, mud, sand or
<br /> 3, Electrical conduit of they be requiredtion shall meeting
<br /> the rand l cal el ct the properly adjusted, that all valves are properly balanced, amd that the 3,01 CONDITIONS AND MEASUREMENT
<br /> Electrical Section of the Specifications, meeting State and local electrical installed system is workable, clean, and efficient, watering alli areas as Final inspection shall be made at the end of the ninety ( 90 ) day maintenance standing water by sweeping or hosing down As required to maintain NO. DATE BY COMMENTS
<br /> codes, approved, period by the Landscape Architect for the purpose of establishing that all of the cleanliness thraughaul, Remove all debris resulting from the work of
<br /> Intended. A. Prior to commencing the work included In this Section, carefully examine the conditions of these Specifications have been met, and for release of the tills section, -- ---
<br /> 1. Valve Boxes: work of other trades and verify that such work Is sufficiently complete so that landscaping and landscape maintenance to Ilio Owner, a
<br /> 1. Valve boxes for remote control valves shall be 16" plastic pits B. Submittals to be provided at Final inspection the planting may be installed in complete accordance with the Drawings and
<br /> (#10.160.001) complete with locking cover as manufactured by Ametek Specifications, In the event of a discrepancy notify the Landscape Architect
<br /> Manufacturing, or approved equal. + Operation manuals and proceed as directed. CND of SECTiON
<br /> + Reproducible Record Drawings END OF SECTION -- -�-- ---- ---
<br /> J, Sprinkler (leads: + Wrenches and keys specified APPROVAL
<br /> 1. All sprinkler heads shall be models, diameter, patterns, GPM and r Contractor's w ritten guarantee and Manr.rlacturets' 3.02 INSTALLATION AND WORKMANSHIP
<br /> manufacturer As Indicated on the Drawings, or Approved eqT ual, warrantee re istration cards t������
<br /> A. Soil Preparatior, arid Pine Grading: .,_._._, ..�.,..,___...,,..,__.__.._.. ..a__
<br /> -
<br /> K. Quick Coupler Valves and Garden Valves 1. All areas to be landscaped shall be�tharoughly ripped arts ratotiiled to AREA ENGINEERING MANAGER DATE HOUSTON,l,� LON, TEXAS
<br /> 1. All Quick Coupler Valves and Garden Valves shall be as Indicated on the a minimum depth of 6 Incites. Areas to be planted with groundcover or _
<br /> Drawings, or approved equal, ENDO OF SECTION grass shall have soil amendment at a rate of six (6) cubic yards per
<br /> 1000 square fe®t And 20 pounds granular fertilizer Incorporated per 0000
<br /> DISTRICT VARAGER DATE
<br /> square feet,
<br /> AREk.DPSTRIQtITION_•._.._4AGER DAT
<br /> 2. Contraclor shrill be responsible for maintaining finish grades In all
<br /> planting areas, and for executing any fine grading as may be necessary
<br /> for drainaoe and incidental to planting operations. Finish grade shall be LANDSCAPE ARCHITECTURE M.C.I./DISTRICT ENGINEER_ �_._.DATE.� a Victor
<br /> Walnut
<br /> below adjoining paving, walks or curbs. Road
<br /> '
<br /> SITE PLANNING 1196 a�tTetrard ay® Suite 11 F� N� F' F'Af���� �Y� Lodi, California
<br /> Creek, CA 94595 � W � �� � � � �� SCALE'
<br /> Isla
<br /> HWA---- (5101} 9 �-9590 L�ISAB�B
<br /> Registration No. 07 ,
<br /> 9 QUAIL COURT, SUITE 303 DA� E: a.,,8/ 18/94
<br /> / 4 4
<br /> SITE DEVELOPMENT CONSULTANTS .......... WAL�PUT CREEK, CALIF f.��NN. BY: WIC
<br /> 1 PHONE: 510-933-0578 FAY,: 510--933-0588 CHM BY: SHEET
<br /> cmirmi,(, _ Zjcl jTs rr-srRvED 1C)93,
<br />
|