Laserfiche WebLink
EXISTING PROPANE <br /> TANK TO REMAIN 0 5 .10 15 <br /> PL, 171. 7 ' <br /> GRAPHIC SCALE <br /> UNDERGROUND PIPING GENERAL NOTES <br /> SAN JQA�),QIN__.00UNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> t SHELL SERVICE STATION SPECIFICATIONS ARE TO BE FOLLOWED <br /> -TIONS: FOR ALL WORK PERFORMED AT THIS SITE <br /> 0 0 1 INSP_E.0 2, ALL WORK, INCLUDING PLUMBING AND ELECTRICAL, SHALL BE <br /> PERFORMED IN ACCORDANCE WITH LOCAL ADOPTED BUILDING <br /> CODES AND SUPPLEMENTARY ORDINANCES, ALL AS DIRECTED BY' <br /> ALL APPOINTMENTS FOR INSPECTIONS MUST BE MADE AT' LEAST 48 HOURS IN ADVANCE COMPANY REPRESENTATIVE. <br /> FOR THE FOLLOWING: 3, CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS AT <br /> A, PRIMARY AND SECONDARY TAINK(S) SHALL BE TESTED PNEUMATICALLY AT 3-5 P,SJ, THE SITE. NOTIFY COMPANY REPRESENTATIVE OF ANY DISCREPANCIES <br /> FOR ONE HOUR; ONE—HALF HOUR FOR PRIMARY TANK AND ONE—HALF HOUR FOR BETWEEN SITE CONDITIONS AND INFORMATION SHOWN ON DRAWINGS, <br /> SECONDARY TANK, DOUBLE WALLED TANKS ARE EXEMPT IF ANNULAR SPACE IS PRIOR TO COMMENCING WORK, <br /> MONITORED USING EITHER PRESSURE OR VACUUM TESTING. (ALL EXTERNAL CONNECTIONS 4. ALL BACKFILL OF UTILITY 'TRENCHES TO BE CLEAN WASHED SAND, <br /> SHALL BE SOAP TESTED WHILE UNDER PRESSURE). 5� PIPING: A.O. SMITH RED THREAD 11 DOUBLE—WALL (PRODUCT). <br /> B. PRESSURE PIPING SHALL BE HYDROSTATICALLY 'TESTED 'TO 150% OR PNEUMATICALLY TESTED SINGLE—WALL (VENT/VAPOR). <br /> TO 110% OF MAXIMUM ANTICIPATED SYSTEM PRESSURE BUT DOES NOT LESS THAN 5 LBS, <br /> PER SQUARE INCH AT THE HIGHEST POINT OF' THE SYSTEM FOR A MINIMUM OF CO MINUTES. 6° CONTRACTOR SHALL PROVIDE A COMPLETE FUNCTIONING FUEL. <br /> DISPENSING SYSTEM MEETING THE LETTER AND INTENT OF THESE <br /> GENERAL CONTRACTOR TO PATCH & PAVE C, ALL LINES OTHER THAN PRESSURE PIPING SHALL BE PRESSURE 'TESTED AT NOT LESS THAN PLANS AND SPECIFICATIONS. <br /> 1000 SQ, FEET OF EXISTING A/C PAVING. 3 P.S.I. AND NOT MORE THAN 5 P,S,I. FOR A MINIMUM OF 20 MINUTES AND SOAP TESTED <br /> CONTRACTOR TO "I.-URRY SEAL EN71Rf._' L(:>?, WHILE UNDER PRESSURE. 7. TANKS: 2-15,000 GALLON XERXES UNDERGROUND DOUBLE— <br /> WALL FIBERGLASS TANKS WITH kP.I,/RONAN RESERVOIR/SENSOR <br /> D. CONTAINMENT SUMPS SHALL PASS A 24 HOUR LEAK TIES]". ALARM SYSTEM MODEL #X76LVC, (TANKS 10' DIAMETER) <br /> E, OVERFILL PROJECTION SHALL IBE CAPABLE OF' DRAINING LIQUID BACK INTO FUEL 'TANKS, 8, INSTALL 8" REINFORCED CONCRETE SLAB OVER 'TANKS. SET MANHOLE <br /> (2) NEW 15,000 GALLON UNDERGROUND <br /> DOUBLE--WA77=_ (77 7=7777— F, MONITORING SYSTEM SHALL PASS A FUNCTIONAL TEST. THE FUNCTIONAL TEST SHALL CONSIST COVERS 1 1/2" ABOVE SLAB, GRADE TO DRAIN, <br /> TANKS ('10' DIAMETER) wl 8" RE­ OF TI-1E ACTIVATION OF THE ALARM VIA THE MONITORING PROBES/SENSORS. 9, ALL FITTINGS AND OPENINGS SHALL BE SECONDARILY CONTAINED <br /> INFORCED CONCRETE SLAB OVER PER TANK MANUFACTURERS SPECIFICATIONS, <br /> REQUIREMENTS ARE SATISFIED AND A HARD COPY OF THE PRECISION TEST IS SUBMITTED 10, ALL FILL BOXES TO BE 25 GALLONS MINIMUM & WATERTIGHT, <br /> G, FINAL INSPECTION AND APPROVAL TO OPERATE WILL BE GRANTED AFTER THE ABOVE <br /> EXISTING WASTE OIL 1" ABOVE SURFACE. (TYPICAL FOR PHASE 1 VAPOR RECOVERY) <br /> EXISTING 2--BAY SERVICE STATION TO INSPECTOR AT SITE, <br /> BUILDING TO BE PAINTED "SILVERADO" TANK wl CONCRETE r0 <br /> COLORS BY SI-IIELL'S PAINTER SLAB TO REMAIN > VAPOR RECOVERY THE CONTRACTOR'S APPROVED PRINTSET OF THE LIST INSTALLATION SHALL BE KEPT AT THE JOB SITE AND 11, ALL MANHOI-E COVERS TO BE WATERTIGHT, <br /> fit/ <br /> MANIFOLD MUST BE SHOWN TO THE INSPECTOR UPON REQUEST. IN ADDITION, THE LOCAL FIRE DEPARTMENT SHALL 12, INSTALL 2-3/4 H.P� SUB—PUMPS WITH A.P.1, DETECTORS, <br /> APPROVE LIST INSTALLATION PRIOR TO COMMENCEMENT OF WORK. <br /> 13. INSTALL 2--2" DOUBLEWALL FIBERGLASS UNDERGROUND PRODUCT <br /> IF YOU NEED FURTHER ASSISTANCE, OR WISH TO SCHEDULE AN APPOINTMENT TO DISCUSS THE PLAN REVIEW LINES WITH PRESSURE MONITOR (FOR QUICK SHUT—DOWN). SEE <br /> OR FIELD INSPECTION, PLEASE CONTACT OUR UNDERGROUND STORAGE TANK STAFF AT (209) 463-3427. EQUIPMENT LIST & SPECIFICATIONS FOR COMPLETE EQUIPMENT <br /> LISTING. ATTACH LIQUID PROBE LEAK MONITOR, WITH PIPING SUMP <br /> TO TANKS. <br /> 14. INSTALL 1-3" UNDERGROUND SINGLE—WALL FIBERGLASS VAPOR <br /> RECOVERY LINE. MANIFOLD FROM MULTI—PRODUCT DISPENSERS <br /> TO REGULAR UNLEADED TANK, <br /> 2--NEW 2" SINGLE—WALL GALVANIZED VENT 15. INSTALL 2­2" UNDERGROUND SINGLEWALL FIBERGLASS VENT <br /> RISERS (CONNECT TO NEW RESP, VENT LINES, LINES (ONE FROM EACH TANK TO NEW RISERS.) <br /> 4 REGULAR SECURE TO NEW VENT STAND & EXTEND 12'­0 SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS, <br /> UNLEADED <br /> 0 MIN. ABOVE FINISHED YARD GRADE, CONSTRUCT <br /> 0 REDWOOD VENT ENCLOSURE PER DETAILS). 16. SLOPE ALL NEW PRODUCT/VAPOR RECOVERY PIPING 1/4" <br /> PER FOOT MINIMUM BACK TO TANKS. <br /> FRI-VIU.0 <br /> F, UNLI.-ADED V — 17. EXCAVATION FOR TANKS SHALL BE PER OSHA REQUIRMENTS, <br /> 0 X., 0 V — 18. PROVIDE DEADMEN & STRAPS PER DRAWING # TP-8 <br /> 0 19, PROVIDE TANK SHORING, kN <br /> NEW 3­0 VAPOR RE _TfL ��A M f�T ANK�,A <br /> NEW 2"0 VAPOR RECOVERY COOVERY ­­--t--:­----Z --IQ <br /> PIPING (SLOPE 1/4" PER FOOT PIPING (SLOPE 1/4" PER FOOT ID I 1 (2) NEW VENT RISERS, 20� GENERAL CONTRACTOR SHALL. FURNISH & IN DEADMAN <br /> MIN. UPWARD FROM TANK) MIN. UPWARD FROM TANK) STAND & VENT RISER <br /> I I ENCLOSURE (SEE HOLD DOWNS FOR ALL TANKS IN ACCORDANCE NTH DETAILS <br /> (2) 2"0 SINGLE—WALL DRWG, SD 1) ON TANK DRAWINGS, IT IS CRITICAL. THAT YOU MEET THE CROSS <br /> FIBERG-ASS VENT LINES (CONNECT SECTIONAL DESIGN & REINFORCEMENT REQUIREMENTS. IF YOU <br /> _j: I ELECT TO USE PRE—FABRICATED CONCRETE DEADMAN HOLD DOWN <br /> TO NEtV U.G, TANKS & EXTEND <br /> TO NEW VENT RISERS (SLOPE <br /> UNITS, SHELL REQUIRES ENGINEERING CALCULATIONS TO CONFIRM <br /> NEW "GILBARCO" MULTI—PRODUCT 1/4" )"ER FOOT MIN. UPWARD 'THAT SYSTEM IS EQUAL TO SHELL'S DESIGN, <br /> GASOLINE DISPENSER W/ SINGLE FROM TANK) <br /> HOSE EACH SIDE, 13LENDING, UNIT, CA- 21, ALL, 'TESTING REQUIREMENTS (TANKS, LINES, BLOCKAGE TEST, <br /> VAPOR VAC k CARD READERS R— PRESSURE DECAL, CALIBRATION, E-CC,) SHALL BE THE RESPONSIBILITY <br /> 0 <br /> (TYPICAL OF 4) OF 'THE GENERAL CONTRACTOR & INCLUDED IN BASE BID, NO <br /> r P EXCEPTIONS, <br /> 22. JTH—LINE PRESSURE MONITOR JREV <br /> R P <br /> 2? NEW 2"0 PRODUCT PIPING <br /> wl SECONDARY CONTAINMENT <br /> za PIPING (SLOPE 1/4" PER FOOT EXISTING FREEWAY I.D. <br /> MIN, UPWARD FROM TANK) SIGN TO REMAIN <br /> NEW 5' x 30' CONCRETE DOUBLE ­­ _._...M_..._.._. <br /> z z I <br /> Ld "DOGBONE" PUMP ISLAND (TYP. OF 2) <br /> NEW Y x 2" REDUCER 2" FIBERGLASS <br /> FITTING (TYPICAL) SEE VAPOR PIPING <br /> A41 DETAIL THIS PAGE 3" FIBERGLASS TEE FROM DISPENSERS <br /> Ld <br /> z r') 3 x 2 <br /> �IBERGLASS <br /> 0 z R GENERAL CONTRACTOR TO PATCH & PAVE BUSHINGS <br /> VR 1000 SO, FEET OF EXISTING A/C PAVING. <br /> P, CONTRACTOR TO SLURRY SEAL ENTIRE LOT. <br /> R P R + P <br /> LLJ 3" FIBERGLASS <br /> NEW 6" RE--INFORCED VAPOR <br /> PIPING TO <br /> CONCRETE DRIVE SLAB TANKS <br /> 2"/3" VAPOR PIPING <br /> P L 143,85' CONNECTION DETAIL <br /> ----------- <br /> .......... <br /> NO SCALE <br /> REVISIONS <br /> NO. DATE BY COMMENTS <br /> ................... ....... .................. =7-_J__�_ <br /> ............. ............... —---------- ................ ­­----- L—2-4- _E EVITFfUL f(T MATCH SITE <br /> .............. <br /> .............................. ........... ......................... ................................................._....._ __.__._..__._ «_....__._.._....... <br /> APPROVALS <br /> SHELL OIL COMPANY <br /> HOUSTON TEXAS <br /> VICTOR ROAD AREA ENGINEERING MANAGER DATE <br /> DISTRICT MANAGER DATE <br /> ................ ......... Pi"in Pig <br /> q_ <br /> DISTRIBUITION MANAGER DATE <br /> NOTE! ALL EXISTING ITEMS ARE TO REMAIN 880 VICTOR ROAD <br /> 5'._-()"'f ....._..........a.. 20'--0" CA— DISP, 5'--0 CONSTRIJJCTION/DISTRiCT ENGINEER DATE <br /> UNLESS NOTED OTHERWISE. LODI, CALIFORNIA CA. <br /> PLANS PREPARED BY: <br /> 2'--6" NEW 30'—()" (',ON(,R[.-*,IE ISI AND 2 —6" <br /> -A & S ENGINEERING SCALE: 10'—0" DRAWING # TP--'1 X <br /> 35--0" NEW CONCRETE DRIVE SLAB PLANNING ENGINEERING CONSTRUCTION MANAGEMENT — DATE: 5/12/94 <br /> WIC # 204-4416---0806 <br /> 49 QUAIL COURT, SUITE 303 DWN, BY: LM <br /> WALNUT CREEK, CALIFORNIA 94596 <br /> INERRiiiii Wisil ;'1 1. <br /> PHONE: 510--933-0578 FAX: 510-933--0588 CHKD, BY: <br /> 1............. <br /> OC SHELL OIL COMPANY, ALL RIGHTS RESERVED 1994. <br /> .......... <br />