Laserfiche WebLink
2 3 4 7 10 11 12 13 14 15 16 17 is <br /> ..............11001111"w INNIN I.............................m1gligis i <br /> ...................MINOR N lig 1 ........... ............. migg <br /> Isigg, <br /> FLEX BOOT, DO NOT USE FERNCO UNION <br /> CONNECTORS HERE <br /> Or <br /> 1 1/2" 0 SAFETY <br /> 2" FRP STRAIGHT __,,,,,"_DISPENSER IMPACT VALVE M <br /> U N 10 N 2" VAPOR FROM <br /> T (ONION <br /> COUPLING, 45' ELL DISPENSER MANIFOLD ELECTRICAL CONDUIT TO EXTEND <br /> OR 90' ELL, ANCHOR 1/2" PAST TOP LIP OF BOX 5" Ile <br /> BOLTS MIN MIN <br /> mm� <br /> 5" 07 <br /> SHEAR VALVE—" DISPENSER MIN 7N DISPENSER ISLAND <br /> STAINLESS <br /> CLAMP (TYP) N11 W/ STL ISLAND FORM <br /> -DISPENSER <br /> Apon- CONTAINMENT SEAL JOINT BETWEEN ANCHOR <br /> DISPENSER ISLAND--,, BOX FIBERGLASS BOX & DISPENSER WCORTEX 1/2" ASPHATUM EXPANSION JOINT' <br /> L JOINT SEALANT (T' SET 1/2" LOW & FILLED W/ <br /> VAPOR RECOVERY FUEL RESISTANT SEALANT, <br /> DRIVE SLAB--\ ,--MECH FLOAT PIPING <br /> 3 MIL VAPOR BARRIER L <br /> 2" FRP PIPE SHEAR VALVE SHUT OFF <br /> <1 <br /> ?N E LO P E <br /> 6" LAP <br /> 0 <br /> A A FI0 1 0 <br /> SECONDARY CONTAINMENT SYSTEM T* <br /> 50P 0 <br /> ......................... a z <br /> KLEA <br /> LOCATE AS DISP, <br /> SECONDARY CONTAINMENT <br /> PIPE ­,SLOPE DOWN­ SLOPE DOWN MOUNTING BOLTS K <br /> tLL <br /> VAPOR RECOVERY PRODUCT LINES <br /> DISPENSER PIPING OPPOSITE WITH SECONDARY PEAGRAVEL BED <br /> CONTAINMENT BOX-- SIDE PUMP ISLAND CONTAINMENT <br /> OF PRODUCT LINES <br /> FIBERGLASS > FILTER FABRIC <br /> PRODUCT LINE ENVELOPE <br /> 2" DIA PIPING FLEX CONNECTOR IN) k141 <br /> (MIN RADIUS 6") SECONDARY <br /> SICONDARY CONTAINMENT/ CONTAINMENT <br /> FLEX BOOT LINE <br /> 2" FRP TEE SECONDARY CONTAINMENT TEE <br /> .N_Q_!E:, SEAL ALL PRODUCT & VAPOR PIPING THRU DISPENSER FIBERGILASS PIPE WITH <br /> CONTAINMENT BOX WALL LIQUID AND VAPOR TIGHT SECONDARY CONTAINMENT <br /> BOOT/TEE CONN. ISLAND ISOMETRIC PEAGRAVEL SPECIFICATION IS THE SAME AS FOR FIBERGLASS TANKS, <br /> 'THE MINIMUM 6" DEEP BED MUST BE LAID AND GRADED TO THE <br /> PROPER PITCH BEFORE THE PIPE RUNS ARE INSTALLED, FABRICATE <br /> PIPE RUNS AT GRADE AND INSTALL IN THE PREGRADED (COMPACTED) <br /> BED, AFTER MAKING NECESSARY CONNECTIONS OF RUNS, BRANCHES H <br /> OR FITTINGS WHICH MUST BE MADE UP IN THE TRENCH, REGRADE AND <br /> COMPACT BED UNDER CONNECTIONS, <br /> PI T <br /> THE MINIMUM COVER TO FINISH GRADE OVER PRODUCT LINES <br /> OUTSIDE THE CONCRETE ISLAND MAT AREA IS 18", <br /> IF PEAGRAVEL IS NOT AVAILABLE, CLEAN MECHANICALLY COMPACTED <br /> SAND MUST BE USED. MINIMUM BED IS 6". SAND BACKFILL OVER <br /> THE PIPING AFTER COMPLETION OF NECESSARY TESTING SHOULD BE <br /> MECHANICALLY COMPACTED IN LAYERS OF 12" OR LESS, THE <br /> 0sw w Emma a MINIMUM CLEARANCES BETWEEN TOP OF PIPE AND UNDERSIDE OF <br /> wwww PAVING MU ST BE INCREASED AS FOLLOWS: <br /> \P\tAG 00 <br /> 40- <br /> A �00 2" 5:: 9" IN TOTAL COVER 6:" (12" MIN TOTAL COVER <br /> C <br /> 3-4 6 10" MIN TOTAL COVER) 6 (13" MIN TOTAL COVER <br /> 2" o GALV, STEEL. 1 <br /> PIPE, PRIMEDNOTE- <br /> F- WRAPPED BELOW GRADE ­ RECOMMENDED PIPE CHASE WIDTH 2'-9* MIN. FOR THREE PRODUCT LINES <br /> *MDTH 3'-g* 01k SECONDARY CONTAINMENT, 2'-0" MIN, FOR 3* DIA, V,R, <br /> F= <br /> UNES EXTEND CHASE BEYOND EDGE OF TRENCH. <br /> 2" 0 GALV, STEEL <br /> THREADED <br /> FEMALEOpi� <br /> COUPLING--,,-'-. 00 <br /> mww now wmwwwo <br /> SECTION TRENCH <br /> ,----2"X24" FLEXIBLE <br /> CONNECTORS (TYP) <br /> SECONDARY CONTAINMENT <br /> BOOT (TYP), NOT SHOWN ON <br /> cn OTHER CONNECTORS FOR CLARITY—— <br /> -----------F'RP VENT LINE <br /> (0 <br /> OVERALL DIMENSION <br /> -------- <br /> DETERMINED BY NU <br /> MBER <br /> OCRLSC0SDAND/OR 10 4 93 TWO TANK SYSTEM RBM <br /> RISER VENT CAP 2' OR 3" 4 VAPM PfM C)AT9 <br /> PUMP ISLAND <br /> MARK AT AND DETAILS <br /> WELD--S M 00 TH _7 GRADE <br /> 1/4" BEVEL. BUTT -PUMP ISLAND MAT YARD GRADE PIPING SCHEMATIC <br /> 4" CHANNEL FRAME --- - <br /> - . <br /> FASTEN VENT 2'.--0 M N _3" STL CHAN- F.G.- VAPOR PIPING LEVEL LINE It0TANKCONCRETE SLAB c <br /> --* <br /> RISERS SECURELY '12°-0 flA NEL W/ 3 8" <br /> TO FRAME WITH TOG U-BOLTS 3/ADE .............. <br /> 0 3/8" U-BOLTS 'TO BLDG, (TYP) MIN, SLOPE 1/8" /FT, -------- <br /> 0 "Z 7 <br /> P3 2" 0 SCH, 40 PIPES <br /> (PRIMED AND FOR DISPENSER <br /> F2 GRADE) 10 AND W CONNECTION SEE 60 MIW COMPACTED BED <br /> DISPENSER ISOMETRIC <br /> TYP,--- THROUGH UNDER VAPOR LINE(S) <br /> SOFFIT \AA (THIS SHEET,) U,G, TANK <br /> SHTMTL CHASE TERMINATE STAGE I YMEN— <br /> E3 TYP OR AROUND USE MAX, AVAILABLE PITCH STAGE 11 NOT REQUIRED <br /> PIPE COUPLING (TYP) SOFFIT 2" 4 VENTS Shell Oil Company <br /> FAUN= CONC, FTG, B <br /> FINISH GRADE F.G, PIPING <br /> -GRADE 1, CONTRACTOR TO INSTALL PREGRADE A MIN, 6" PEA GRAVEL BED FOR ALL <>-2* 0 PIPE VENT RISER YARD GRADE <br /> FIBERGLASS PIPING. ..... (SEE VENT RISER DETAIL <br /> Vl (-70R NOAD <br /> MIN. PITCH TO TANKS 1/8' /FT, THIS SHEET,) <br /> 2. FABRICATE PIPE RUNS AT GRADE & INSTALL IN TRENCH, CONCRETE TANK SLAB 'CA Ll FOR ' <br /> CONTAINMENT k 3, AFTER MAKING NECCESSARY CONNECTIONS OF RUNS OR FITTINGS IN TRENCH, LEVEL LINE,,!'' WIN LO DI <br /> REGRADE & COMPACT BED UNDER Y CONNECTIONS, <br /> BOOT NOT <br /> 2.1 4, REMOVE ANY GRADE STAKES, ETC, PRIOR TO BACK FILL, <br /> SHOWN FOR IMS CLARITY, 5. NO SAGS OR HUMPS PERMITTED, MIN, SLOPE 1/8* /FT, <br /> PEA GRAVEL BED BACKFILL 15 STANDARD, USE MAX, AVAILABLE PITCH- <br /> 2"X24" FLEX <br /> A CONN. W/ SW1VEL SEE MINIMUM TRENCHING & BURIAL REQUIREMENTS 1 2" 0 F,G, VENT PIPING <br /> z ND FITTING U.G. TANK A <br /> 0 FOR TANK CONNECTIICON COMPACTED BED <br /> z VENT RISER DETAIL ENT RISER BLD SEE TANK ISOMETRUNDER VENT LINE(S) <br /> § VENT/VAPOR PIPING SLOPE SHEET <br /> < <br /> sy <br /> TP, <br /> 6 <br /> 17 <br /> rl I_.­,,CA,_C('*Its ANY_ A1_9_jW",M,_Qrj <br />