Laserfiche WebLink
LLNL Emergency Management Plan <br /> Rev 24 <br /> January 2019 <br /> Table 2.1 Emergency Operations Center Activation Status Level <br /> Status Level AL Staffing Activities Notes <br /> Stand-by N/A None No activities in EOC. This is the normal <br /> EOC equipment, workday configuration <br /> systems are off,but and status for the EOC. <br /> are available for <br /> operations. <br /> Monitor N/A None; however,ERO EOC is not Examples: Protest <br /> staff or LEDO may be operational,use of demonstration,planned <br /> present to monitor plans/procedures or LLNL event <br /> situation. Emergency Plan is (e.g.,National Ignition <br /> not necessary. Facility Dedication, <br /> EOC equipment, Family Day). <br /> systems are turned on <br /> and may be used. <br /> Activated Key Staff ED, Liaison Officer, EOC can be declared Examples: Severe weather <br /> Public Information operational(once advisory, earthquake <br /> Manager(PIM), minimum staffing advisory, local building <br /> Newswriter,EMC, requirements are power failure, security <br /> EOC Coordinator,LFO met). event, Operational <br /> Emergency Manager, Emergency. <br /> Operations Chief, EOC operated in <br /> Operations Chief Aide, accordance with See Section 2.4.1 for list <br /> ES&H Lead,Facilities plans/procedures and of minimum staffing <br /> Lead, Security Lead, Emergency Plan. requirements. <br /> Planning&Intelligence <br /> (P&I) Chief, <br /> Accountability/Advance <br /> Planning Lead, <br /> Communications <br /> Specialist, CQT Lead, <br /> CQT Modeler, <br /> Information Lead, <br /> Information Specialist, <br /> Mapping Specialist, <br /> Significant Events <br /> Specialist,ALF Chief, <br /> EMDO, On-Scene <br /> Communicator <br /> Activated Full Staff All EOC positions EOC and ERO Examples: earthquake <br /> staffed operate in accordance (disaster), security event, <br /> with Site Area Emergency or <br /> plans/procedures and General Emergency. <br /> Emergency Plan. <br /> The EOC is organized according to SEMS/NIMS functional areas (see Table 2.2). <br /> 34 <br />