My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
INSTALL 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:44:00 AM
Creation date
5/10/2019 2:21:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. V Plans drawn to scale in non-erasable print. <br /> 3. " Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. ✓ Tank cross-sectional diagram. <br /> 6. ✓ Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> / Article 3, Section 2631 (b) & 26351 <br /> 8. Y Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, <br /> 10. 1 / At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> // secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] TFC/— ) <br /> 11. v Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. (Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # # -2 # <br /> CAPACITY IZ LSC� `Z�/ 66� /,`"F C CS <br /> MANUFACTURER XC2xc� x c2 �fY2�cE <br /> COMPOSITION f=%Z/� Flo F-f p <br /> MODEL <br /> �!,nZ770 a ULAe 5 t/�RG+�L <br /> PRODUCT q = J -- e_i,4e C LL)C <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% cJ <br /> METHANOL /ES <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> _ (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.