Laserfiche WebLink
Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ® Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used:Wayne Perry Inc. See Attached Results Equipment Resolution:.0007 <br /> Spill/Overfill Containment Number <br /> �P t, 9/ f� <br /> Bucket Diameter: /2" 17- Z" /z" 17- /2" 1?- <br /> UC <br /> ?- /Z" <br /> Bucket Depth: /y % " %S%i 1�, /� „ /s/„ /6 „ �� ,> /'S " <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: //. y 7 S 2.'r7G 7-' Z ` ? ='./J /Z-' z .• Y7 //-'3o <br /> Initial Reading(RI): 6.O 0 _ Z oQ i o S 9 0.97 Sr/' D.6 /Z 0- 45 6 7 xe�' /.d 00 3 <br /> Test End Time: Z- p Z /7; z /Z., z/ /-- 9 z:,s /Z'3 /z•'o /•' 3'S <br /> Final Reading(RF): J_ 6v /_ z 'r// /.o Z 5'7 d•977 O. e D b-0 6 i. t 3 /, Co/v <br /> Test Duration: t4 1 �,. t „� 1 .;,,� 1 1,.,.,.1 l S li'f15 `. is 01-1 <br /> Change in Reading(RrRt): ,000 go ©poi .000/ Fr .010.7 iS .00.0010. .o 'z/ o006 <br /> Pass/Fail Threshold or _0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Criteria: <br /> I Uri <br /> Test Rest�: � ❑.LK <br /> £ v <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Arco 6313 <br /> 1100 S. Main St. <br /> Manteca, Ca 95337 <br /> N05789 SB 989 Testing <br />