My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1997 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 1997 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 4:09:41 PM
Creation date
5/10/2019 2:31:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997 - 2005
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanica� --ak Detector Test Data Sheet <br /> "ARCO Products Company <br /> Station # D(t 31- 3 Date /19 <br /> Address <br /> Test Information <br /> LP�e /oj6 6/b Z. �Gieo <br /> 1 2 3 4 5 <br /> Product f p r;' f7— <br /> Manufacturer a,�pv;c lesl trlf 04ZC-4 o4vx-(.et <br /> Model �D-aaov G� av1,o 1*01) <br /> Full Operating Pressure (psi) 20 Z 4 .2 k <br /> Line Bleed Back (ml) /00 p' <br /> Trip Time (sec) Z Z 2 <br /> Metering,Pressure (psi) A404 Z-L � 22 JW a1 <br /> F/E Holding Pressure (psi) AdAL �L'� WOO-` Zd <br /> Test Leak Rate (ml/min) (gph) D ado /oo <br /> PASS or FAII. SS �i'tsJ yf�rs <br /> Replaced All Failed Leak Detectors Yes No N/A <br /> If No, Replacement To Be Completed By (Date) <br /> This letter certifies that the annual leak detector tests were performed at the above referenced facility <br /> according to the equipment manufacturers procedures and limitations and the results as listed are to my <br /> knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br /> threshold trip rate of 3 gph at 10 PSI. <br /> Inspected By: Contractor I'//,4A/jlc' <br /> i <br /> Technician �A+H(;3 /3e c^'t"� Lic# <br /> Signature <br /> APC-3325(8/96) <br /> ^r -1-1, - <br />
The URL can be used to link to this page
Your browser does not support the video tag.