Laserfiche WebLink
' IINiviri 1 pRn(_'RAM rOMR I1MATFII FnRm <br /> TANKS <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 <br /> N l <br /> Pae of <br /> - <br /> ,�a:+. ' YI�PIEING.CONSTRUCTIOIV.(Checliallliaia <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE 1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 459. ❑ 1.PRESSURE ❑2.SUCTION [13.GRAVITY 459. <br /> CONSTRUCTION/ ❑ L SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460. ❑1.SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER 2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER PtfAE{L0W 461. MANUFACTURER 463. <br /> ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑I.BARE STEEL [16.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL [12.STAINLESS STEEL [17.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN [13.PLASTIC COMPATIBLE W/CONTENTS [18.FLEXIBLE(HDPE) ❑99.OTHER <br /> X4.FIBERGLASS ❑8.FLEXIBLE(.HDPE) ❑99.OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464. ❑5.STEEL W/COATING ❑95.UNKNOWN 465. <br /> Il( INGsLADE ICION'(Check ull that a"'ly)'(rt dacrIloii ofihe rroito ng'iograni3l elflzsurr�ined Co theueaK� eifoy:ji'k .�e � e e( ta <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467. <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP ❑ I. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> ❑2. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [35. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> 9. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> ❑8. DAILY VISUAL MONITORING <br /> E19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> (]a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT ❑ 11. AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑ 12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑ 13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑ 13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF [114.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARIVIS <br /> ❑ 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑ 16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑ 17. DAILY VISUAL CHECK ❑ 17. DAILY VISUAL CHECK <br /> VUL DISPENSER CONTAINMENT <br /> y, <br /> DISPENSER CONTAINMENT 468. Z1.1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED ❑2. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS [15. TRENCH/LINER MONITORING <br /> -7 �3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR [16. NONE <br /> 9 I D ISPEN SER+AUDIBLE AND VISUAL ALARMS <br /> IX.QWNER/OPERATOR:$IGNATURE <br /> (certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF R/OPERATOR DATE: 470 <br /> 171, <br /> NAME OFOWNER/OPERATOR(prinQ: '/U L.DEE.p - SH�M� TITLE OF OWNER/OPERATOR: �MF'�1�EA �WNE� c,-9 LL e- <br /> � <br /> Permit Number(Agency use only) ` 473. 1 Permit Approved By(Agency use only) 474. Permit Expiration Date(Agency use only) 475. <br /> UPCF hwfwrc-b(1/99)-3/4 http://www.unidoes.org Rev.02/16/00 <br />