My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1997 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
BILLING 1997 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 12:40:34 PM
Creation date
5/10/2019 4:17:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1997 - 2005
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641(h) <br /> FACILITY NAME pr-4-z.z. o ""- i0 7 ,3 DATE -7 o"Z <br /> FACILITY ADDRESS l L o o vA A-t n1 St 'r , 14 N roc A <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> rq-n1 F <br /> 6A-&-A— 1 YV K1 ti r4 Cc.EYL C h-1 o A!LT o YL c N G <br /> /v&L S S r IJ (,o rt TYt_Z�L 6M f t N E s Q+^�c52 b�`*�c y kh At N s e*�►��x� o 5 O rC tt, <br /> 2.Desc ibe the frequency of performing the monitoring for: <br /> TANKS n ti-r t N v o--S PIPING r,o--Pv L ry <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location of sensors <br /> S E'NS.J�2 S 'r+•J+w�- �'n-G�1 G✓ ww.(�� (!f�C. YLi P1 N�'i On2� .0>4-��-- r iv 1'�At.K_ d-ahMn . <br /> 4.Describe the following equipment for each underground storage tank <br /> Name and Model of Monitoring Panel V E��62,-- ►'Lvnr -T-- <br /> Name and Model of Line Leak Detectors v,A4 e4—t.E5.S t_o -Zoon ', �� � -t`T I�Xi t✓ <br /> Name and Model of Annular Sensors `r 4c+2 +2eof 1 S L4 30V c) -tet o 9 <br /> Name and Model of Piping Sensorsy - a-r-0I "L,-%-1 3-to ' 1-0 T <br /> Name and Model of Dispenser Sensors \1 enS `t 41-1 3ci 0' Z o 7 <br /> Type of overfill prevention F--+" <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yesy- No D <br /> Does the turbine shut down if a sensor is disconnected? Yes No D <br /> Does the turbine shut down is the monitoring panel loses power? Yes No D <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> Ak ror- 1-Kiror¢_V wk",- Itr t,obVeD or+ VST M.."n.t LOG" AVo ��v�rzC-fl v►1A 1NrC�"'[E <br /> IJ0 Te-1p A-vl. 0-*-urrt.0S w l v— NF V Z'`P c ," &i <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? ",j N a N't 6rfA-rQ LZ- f"fit-Er t s w►c H ftA0"i rVVL <br /> yr►yt_ FSG f,4-t�l &tj Irvlo pAtSStVrQ I,oNSKAt- • A"NkVOYL IS L -rlF1Eft �N <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system, including piping, and the monitoring <br /> equipment. Te R 1 N L w l l.-L R E Q to r DC-v V PO N t+-+ILE ' r N Q o— ES nt�lz C- <br /> -A-r N N C- <br /> PL-0v�D�� kT %---AVT A-NNVA-L—,( <br /> 1:vmtcmi-ic\usroion i toringplan.doc <br /> 1/24/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.