Laserfiche WebLink
J 1 <br /> SWRCB,January 2002 Page I_of (.J <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present,but were Not Tested <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Fill Sump# 1 Fill Sump#2 I Fill Sump#3 Fill Sump# <br /> Sump Diameter: 48" 42" 42" <br /> Sump Depth: 58" 58" 59" <br /> Height from Tank Top to Top of No Piping No Piping No Piping <br /> Highest Piping Penetration: Penetrations Penetrations Penetrations <br /> Height from Tank Top to Lowest 42" 36" 42" <br /> Electrical Penetration: <br /> Condition of sump prior to Dry Dry Dry <br /> testing: <br /> Portion of Sump Tested Water Level 44" Water Level 38" Water Level 44" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test: <br /> Test Start Time: 9:10 9:15 10:00 <br /> Initial Reading(Rj): .001 .001 .001 <br /> Test End Time: 9:40 9:45 10:30 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑ Fail <br /> Is there a sensor in the sump? X Yes ❑No X Yes ❑No X Yes ❑No ❑Yes ❑No <br /> Does the sensor alarm when <br /> either product or water is X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> detected? <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes �],No ❑NA ❑Yes ❑No [INA <br /> verified functional after testin(�'? J <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />