Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 10. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ._ <br /> L--).— <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard Px fer 116g�neer <br /> 11 Other(Specify) II <br /> Test Method Used: ❑Pressure ❑VacuumdL rostatic <br /> ❑Other(Specify) <br /> CNV461i�VIEN AHEAUH <br /> Test Equipment Used: Equipment Resolu i <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />