My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5000
>
2800 - Aboveground Petroleum Storage Program
>
PR0527046
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 9:20:08 AM
Creation date
5/13/2019 9:06:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527046
PE
2832
FACILITY_ID
FA0003907
FACILITY_NAME
PANELLA TRUCKING LLC
STREET_NUMBER
5000
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14330001
CURRENT_STATUS
01
SITE_LOCATION
5000 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Received on 10/29/2019 <br /> SJC EHD - CR <br /> Spill Prevention Control and Countermeasures Plan <br /> PANELLA TRUCKING, LLC. <br /> 5000 East Fremont Street, Stockton, <br /> San Joaquin County, California <br /> Facility Management Certification <br /> The PANELLA TRUCKING, LLC. management is committed to preventing discharges of oil <br /> to navigable waters and the environment and to maintaining the highest standards for Spill <br /> Prevention Control and Countermeasures Plan (SPCCP) through the implementation and <br /> regular review and amendment to the SPCCP. This SPCCP has the full approval of Facility <br /> management. Facility has committed the necessary resources to implement the measures <br /> described in the SPCCP. The Emergency Coordinator is the Designated Person <br /> Accountable for Oil Spill Prevention at the Facility and has the authority to commit the <br /> necessary resources to implement this SPCCP. <br /> Authorized Facility Representative (Facility response coordinator): <br /> Mr. Davis Winters <br /> Name SgMture <br /> Operations Manager <br /> Mae: Date: <br /> Professional Engineer Certification [40 CFR 4 112.3(d)] <br /> The undersigned Registered Professional Engineer (RPE) is familiar with the requirements <br /> of Part 112 of Title 40 of the Code of Federal Regulations [40 CFR § 112] and has visited <br /> and examined the Facility (or a qualified representative). The undersigned RPE attests that <br /> this Spill Prevention, Control and Countermeasure SPCCP has been prepared in <br /> accordance with good engineering practice, including consideration of applicable industry <br /> standards and the requirements of[40 CFR § 112], that procedures for required inspections <br /> and testing have been established; and that this SPCCP is adequate for the Facility. [40 <br /> CFR 112.3(d)] <br /> This certification in no way relieves the owner or operator of the Facility of his/her duty to <br /> prepare and fully implement this Plan in accordance with the requirements of 40 CFR part <br /> 112. This Plan is valid only to the extent that the Facility owner or operator maintains, tests <br /> and inspects equipment, containment and other devices as prescribed in this Plan. <br /> pR0FE�7 <br /> William anDerWatl C82560 _ <br /> California PE License Number C 62560 <br /> Expires: 31 December 2017 9� �7yL \p <br /> �OALIFO <br />
The URL can be used to link to this page
Your browser does not support the video tag.