Laserfiche WebLink
Food Express, Inc. - Lathrop, CA <br /> PLAN CROSS-REFERENCE(40 CFR 112.7). <br /> SPCC <br /> Regulation Description of Requirement Section <br /> 40 CFR <br /> 112.1 General Applicability Pae 3 <br /> §112.3 Requirements to Prepare and Implement an SPCC Plan <br /> §112.3(d) Professional Engineer Review and Certification Page 5 <br /> §112.3(e) Location of the SPCC Plan Page 5 <br /> 112.4 Amendment of SPCC Plan by Regional Administrator Page 6 <br /> §112.5 Amendment of SPCC Plan by Owner/Operator Page 6 <br /> §112.6 Qualified Facilities Plan Requirements Page 7 <br /> §112.7 General Requirements for SPCC Plans <br /> General Requirements;Discussion of Facility's Conformance <br /> with Part 112 Requirements; Facility Diagrams;Facility Ammendu A <br /> §112.7(a) Description;Discharge Prevention Measures;Discharge and <br /> Drainage Controls;Discharge Countermeasures;Recovered Page 7-27 <br /> Material Disposal; Contact Lists and Phone Numbers <br /> §l 12.7(6) Failure Analysis Page 22 <br /> §112.7(c) Secondary Containment and Diversionary Structures Page 23 <br /> §112.7(d) Contingency Planning Page 24 <br /> §I12.7(e) Inspections,Tests,and Records Page 24 <br /> I` §I12.7(f) Personnel Training and Discharge Prevention Procedures Page 25 <br /> §112.7(g) Security Page 26 <br /> §112.7(h) Facility Tank Truck LoadingfUnloading Page 27 <br /> §I12.7(i) Brittle Fracture Evaluation Page 27 <br /> §112.70 Conformance with State Requirements Page 27 <br /> §112.7(k) Qualified Oil Filled Operation Equipment Page 27 <br /> §112.8 Requirements for Onshore Facilities <br /> §112.8(a) General and Specific Requirements Page 28 <br /> §I12.8(b) Facility Drainage Page 28 <br /> §112.8(c) Bulk Storage Containers Page 28 <br /> §112.8(c)(1) Construction Page 28 <br /> §I 12.8(cx2) Secondary Containment Page 28 <br /> i §112.8(c)(3) Drainage of Diked Areas Page 28 <br /> §112.8(cx4) Corrosion Protection Page 28 <br /> §I12.8(cx5) Parially Buried and Bunkered Storage Tanks Page 28 <br /> §I12.8(cx6) Inspections Page 29 <br /> §I12.8(c)(7) Heating Coils Page 29 <br /> §I 12.8(c)(8) Overfill Prevention System Page 29 <br /> §I 12.8(c)(9) Effluent Treatment Facilities Page 29 <br /> §112.8(cx l0) Visible Discharges Page 29 <br /> §112.8(c)(I 1) I Page 29 <br /> §112.8(d) I Facility Transfer Operations, Pumping,and Facility Process Page 29 <br /> i � 1 <br />