My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527961
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 4:03:05 PM
Creation date
5/14/2019 9:38:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527961
PE
2832
FACILITY_ID
FA0018952
FACILITY_NAME
AAFES WEST COAST DISTRIB CENTER
STREET_NUMBER
700
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95231-9735
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
700 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention,Control&Countermeasure Plan <br /> Army&Air Face Exchange SeMce West Coast Distribution Center r <br /> Management Responsibility <br /> In accordance with 40 Code of Federal Regulations (CFR) 112.7, the responsibility for oil spill control <br /> at the AAFES West Coast Distribution Center has been assigned as identified below. <br /> AAFES is committed to providing the manpower, equipment, facilities, and materials required to <br /> establish precautionary measures and to expeditiously control and remove any harmful quantity of <br /> oil or hazardous substances discharged from the Distribution Center. <br /> By signature, I certify that I have reviewed and approved this Spill Prevention, Control, and <br /> Countermeasure (SPCC) Plan and agree to implement the necessary changes. <br /> Signed: Date: <br /> Printed Name: Position: <br /> Certification <br /> In accordance with 40 CFR §112.3, the undersigned Registered Professional Engineer attests the <br /> following: <br /> I certify that I am familiarwith the requirements of 40 CFR 112; that my technical representative has <br /> examined the facility; that this SPCC Plan has been prepared in accordance with good engineering <br /> practices, including consideration of acceptable industry standards and the requirements of 40 CFR <br /> 112; that procedures for required inspections and testing have been established; and that this SPCC <br /> Plan is adequate for the facility. <br /> This certification in noway relieves the owner or operator of the facility of hisiher duty to prepare and <br /> fully implement this SPCC Plan in accordance with the requirements of 40 CFR 112. Certification of <br /> compliance is made contingent on the implementation of SPCC measures identified in the <br /> Implementation,Schedule. <br /> Signed: ,Ars j Date:_ 10/13/2015 <br /> _ <br /> Michael C. Ernst <br /> Licensed Professional Engineer <br /> State of California P.E. <br /> QROFESSzo <br /> p.ei.C.pR.1. ' <br /> 6602 <br /> sa y <br /> p p <br /> Y <br /> HEMIGP'oQ�'�e' <br /> OF CALIF <br /> oc1&er2015 I i <br />
The URL can be used to link to this page
Your browser does not support the video tag.