My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:34:29 AM
Creation date
5/15/2019 11:02:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mntiitming System Certification-Page 3 of 3 <br /> Site Address. 6425 N. Pacific Ave. @ Central Ct. Date ofTeoting/Servieing: 4/20/04 <br /> F. in,Tank Ganging/MR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be complpled if in-tank gauging equipment is used to perForm leak detection monitoring. <br /> Complete tl?e following checklist*. <br /> C Yes o No* Has all input wiring been inspected for proper entry and termination.. including testing for ground faults? <br /> 0 Yes C No* Were all tack gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes 0 No* Was accuracy of system product level readings tested? <br /> C Yes C No* Was accuracy of system water level readings tested? <br /> 0 Yes C No* Were all probes reinstalled properly'? <br /> C Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> *in Section 14 below,describe how and when these deficiencies were or will be corrected. <br /> r- i.inN i.Pak Iletacttirs(I.I.fl): ❑ Cherk this box if T.T.Ws are nor installed. <br /> Cont fete the following checklist: <br /> 0 Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> C N/A (Check all rhar apply) Simulated leak reate: K 3 g.p.h.(L); C 0.1 g.p.h.(2.): C 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated bZ local agency,certification required only for electronic LLD start-up. <br /> 10 Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> ®Yes C No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak'? <br /> a N/A <br /> a Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak'? <br /> C N/A <br /> 3 Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> C N/A or disconnected? <br /> Go Yes 0 No* for electronic L1-D's,docs the turbine automatically shut off it any portion of the monitoring system <br /> C N/A malfitnctions or fails a test? <br /> M Yee n Nn* For dertrnnir.T.t.T)'c,have all acressible wiring connections been visually inspected? <br /> 0NA <br /> is Yes 0 No* I Were all items on the equipment manufacturer's maintenance checklist com leted? <br /> *In Section 11 below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> L0 3E)Vd ONI SSS 9ET0IL680V 99:91 V00Z/0Z/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.