Laserfiche WebLink
ENVIRONMENTAL HEALTAEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> a Donna K.He R.E.H.S. Unit Supervisors <br /> 2 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Director Mike Huggins,R.E.H.S., R.D.I. <br /> AI Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • cgo,F wii'\, Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> March 19,201fegram Manager Mark Barcellos,R.E.H.S. <br /> RHL Design Group <br /> 1340 Arnold Drive Suite 110 <br /> Martinez CA 94553 <br /> RE: Safeway Fueling @ 6425 Pacific Ave.,Stockton <br /> The following is your revised conditions of approval to continue the installation of a new underground <br /> storage tank system at the above location: <br /> 1. Contact the fire department and the San Joaquin Valley Air Pollution Control District for applicable <br /> permits. <br /> 2. Any changes shall be submitted to EHD for approval prior to commencing work. All new submittals <br /> supercede the previous ones. <br /> 3. Both primary and secondary pipes shall bear a UL label. <br /> 4. All fittings,penetration,sumps and under-dispenser containment shall bear a UL label. <br /> 5. The vapor recovery, vent and fill risers shall be secondary contained per plans. <br /> 6. All monitoring systems shall be listed on the LG 113-16. <br /> 7. All testing shall be in compliance with manufacturer's instruction,section 2635 and section 2636 of <br /> California Code of Regulations (CCR) <br /> 8. Automatic pump shutdown must satisfy CCR 2636(g). <br /> 9. All piping must slope to a containment sump with an audible/visual alarm. <br /> 10. All tank top openings,that are connected to the primary space of the UST must have secondary <br /> containment, audible/visual alarm and be product(liquid&vapor)tight or terminate at grade. <br /> 11. Sumps and under dispenser containment must be constructed in a manner to prevent vapors from <br /> entering the backfill. <br /> 12. All secondary containment must be constructed to prevent water intrusion. <br /> 13. Overfill prevention shall satisfy CCR 2635(b)(2)(B). <br /> 14. An accurate and drawn-to scale-as-built plan must be submitted to EHD prior to scheduling a final <br /> inspection. <br /> 15. Passing Enhanced Leak Detection(ELD)Results must be received prior to the final inspection. <br /> Note:A separate permit application is required to install ELD. <br /> 16. Contact Michelle Le, Senior REHS (209)468-9847 for inspections. See inspection checklist for the <br /> required inspections.All appointments must be scheduled 48 hours in advance. <br /> Note: The vent riser transition containment sump must bear a UL Label. <br /> Thank you <br /> Michelle Le,REHS <br /> Senior Registered Environmental Health Specialist <br />