FUEL DISPENSER
<br /> FUEL DISPENSER STABILIZER BAR
<br /> STABILIZER BAR FUEL DISPENSER STABILIZER BAR
<br /> I I/2" (p PIPE RISER SPRING NUT I I/2" (P PIPE RISER
<br /> SPRING NUT I" STREET 90° W/ 1" @ NPT SPRING NUT UNION (FURNISHED BY MFR) UNION(FURNISHED BY MFR)
<br /> PLUG NIPPLE 4 UNION(SUPPLIED SEAL "WATER TIGHT"
<br /> 5EA1- "WATER TIGHT" BY CONTRACTOR) TO BE AT ALL OPENINGS MOUNTING PLATESAFEWM
<br /> AT ALL OPENINGS CONNECTED YU DISPENSER AT �NIIGHT�� MOUNTING PLATE
<br /> TOP OF ISLAND 30 SPLASHGUARD 5PLA'�iCUARD TOP OF ISLAND 30 SPLASHGUARD
<br /> TOP OF ISLAND
<br /> _ DOOR KIT • i c D =
<br /> DOOR KIT 3I
<br /> 31 ° 0 D DOUBLE SHEAR VALVEDOUBLSH
<br /> E EAR VALVE(SHEAR
<br /> O O
<br /> ° O O (SHEAR VALVE GROOVE TO ��- O O 11 SHEAR VALVE GROOVE TO BE
<br /> 1 ° IT BE INSTALLED FLUSH W/TOP FRP DISPENSER ° INSTALLED FLUSH WITH TOP OF
<br /> - SHEAR VALVE I6 I - _
<br /> Or BLOCK SUMP Al TOP FRAME 29
<br /> 29. °JUMP yv PRA- iii FRF 015PENSER ° A STOP FRAMER 2q P �� , 24 FLEX CONNECTOR, M x MS i 4 FLEX CONNECTOR,M x M5
<br /> 5EN50R MOUNTING BOOT
<br /> �4 2" BELL MALE
<br /> JUNGTION 1EE i � 4" BOOT KIT 54 y0 REDUCER
<br /> i� FRP ADAPTER FITTING REDUCER REVISIONS
<br /> 69 4" BULK HEAD b9 44 BULK HEAD
<br /> ENTRY FITTING REVISPD IM EHO
<br /> PENETRATION TEST 8007 ENTRY FITTING TEST BOOT— Qi WMiENT5 I1/03/03
<br /> (BULKHEAD)
<br /> FLEX CONNECTOR FITTING TIO
<br /> M x MS 2q. _ REVISED FOR
<br /> E�)y (1) 1" CONDUIT DATA < I j PERMIT 02/20/04
<br /> 69 FOYER CONDUCTORS 4" FLEXIBLE
<br /> 2" COAX FRP FOR g4 4° FLEXIBLE ROCK (2) 3/4" CONDUITS 64 � � X04
<br /> RECOVERY LINES TO VAPOR G VER WARD - INTERCOM d LIQUID ROCK WARD
<br /> SLOPE DOWN I/8" ASSEMBLY 66 y3 FLEXIBLE PIPE SLOPE PER ./UMP 5EN50R 63 FLEXIBLE PIPE SLOPE PER
<br /> PIPING PLAN (MIN. I/8" PER
<br /> TO REGULAR UNLEADED TANK. LIQUID SENSOR 51. PIPING PLAN(MIN. 1/8" PER *G10° ELBOW
<br /> SEE: PIPING OR05SOVER M. FOOT TOWARDS TANK) FITTING 611 FOOT TOWARDS TANK)
<br /> SENSOR CUP 32 SENSOR CUP 32 FLEXIBLE PIPE FLEXIBLE PIPE
<br /> TERMINATION LIQUID SENSOR 51
<br /> FITTING125 OR�26) DIRECT CONNECTION DIRECT CONNECTION
<br /> CLAMP5 SENSOR CUP 32 CLAMPS
<br /> 1 SUBMITTAL
<br /> 1 VAPOR RECOVERY PIPING DETAIL @ DISPENSER NOT TO SCALE A N.T.S. SEE SHEET JUNCTION DISPENSER SUMP DETAIL TERMINATING DISPENSER SUMP DETAIL NOT USED DA1E5
<br /> �} 0 NOT TO SCALE OWNER.
<br /> ° F51, DETAIL 6, NOTE 4. N.T.S. • SEE SHEET F51, DETAIL 6, NOTE 4.
<br /> --- ------
<br /> ---- ._. . ._ REG. A6ENCIE55UBMITTAL
<br /> HINGE - - - 09/06/03
<br /> 1-1/2" TEST TANK LEVEL MONITOR 50 49 48 PRESSURIZED LINE LEAK DETECTOR 42" OR 36" @EASY LIFT OUT TO BID: 10/111/03
<br /> ASSEMBLY 2" SCR'D TEE W/MONITORING GAP
<br /> It
<br /> TYP. OF (2 150% M.I., BLACK AND ADAPTER 2 H. P. TURBINE I ® OBSERVATION DOOR 3.1 4.1
<br /> MANHOLE YV 12"
<br /> 24" I12' PVC DRAIN PIPE 8�
<br /> LGN5GHL40 3 _ X 12" L6. z A,
<br /> n
<br /> CARBON STEEL ° ° ° W 5 R-
<br /> lu
<br /> BLACK, a
<br /> 63 64 TYP. OF (2) {' E f
<br /> o= iv PEA GRAVEL
<br /> 2" SGRV ELL 90° z� 4
<br /> JUNCTION BOX - _ BACKFILL
<br /> 150%,M.I.,BLACK EXPLOSION PROOF '�= �' S='�>G c�;:''o;CS . z
<br /> Tyr. OF (2) 26 2'S LL vE :o o;�.o),�_,e aha °x 1'-O" x I'-D" w �
<br /> STYROFOAM
<br /> (TYP. OF 2)
<br /> 0 0 3 4 JUNCTION BOX A
<br /> 3 48" OR 42" FIBER6LA55 ✓ F z
<br /> ¢TANK 2 — g SUMP TUBE W/LID , EXPLOSION PROOF F
<br /> 52 3/4" (4) 51VDS DOUBLE ELECTRICAL SEAL OFF
<br /> 21 ®ENDED ENTRY FITTING EXPLOSION PROOF vva�y sw�
<br /> 5/4" CONDUIT FROM I" CONDUIT NOTE dm
<br /> 33 VARIABLE FREQU2NCY FOR DIESEL PRODUCT USE ONLY BLACK
<br /> CONTROLLER 1 b
<br /> ' -1/2" TEST A55EMOLY IRON PIPE AND FITTINGS WHERE
<br /> GALVANIZED PIPE IS GALLED FOR.
<br /> 48 4q 50 y I" RI61D CONDUIT 1
<br /> a, I" CONDUIT TO I-I/2" CO-FLEX DOUBLE
<br /> ZO NEXT TURBINE SUMP �'1"i;,'; _ WALL PRODUCT PIPE b3 64
<br /> 3/4" CONDUIT l INSIDE 4" ROCK GUARD 3
<br /> 28 ( , OF FROM FILL SUMP 21 1" (4) STUDS DOUBLE 2" X 4.8" PENETRATION
<br /> O ENDED ENTRY FITTING 10 BOLT 5EAL bq
<br /> WESTERN FIBERGLASS, O
<br /> _ TYP. OF (2)
<br /> PROJECT NO.
<br /> PLAN 06 FLEX CONNECTOR _ --- PIPE END 2" MALE 098.40
<br /> NON-SWIVEL W/ TYO CLAMPS DRAWN 8Y:
<br /> NOTE: PIPE ANGLE AT ENTRY BOOT SHALL NOT EXCEED A 15 DEG. ANGLE IN ANY DIRECTION WESTERN FIBERGLASS, TYP. OF (2)
<br /> O RISER CHECKED BY.
<br /> 2"X COUPLING
<br /> a ® SENSOR MOUNTING KIT 150% M.1., BLACK
<br /> .P ! CAD SAVED NAME:
<br /> 2"10'tFS3,dw
<br /> 2'•/ �j TEE OUTLET @ TURBINE SUMP SECTION LIWID SENSOR 52 NOT USED
<br /> N.T.B. -
<br /> 0 48" @ EASY LIFT MANHOLE ® PRE55URIZED LINE LEAK DETECTOR O
<br /> HINGE
<br /> WITH 12" OBSERVATION 51 TANK LEVEL MONITOR (y C3
<br /> 52 63 64 TANK LEVEL MONITOR 105 2 H. P. TURBINE PUMP DOOR 48 49 50 W/MONITORING GAP ® 2 H. P.TURBINE PUMP PEA &RAVEL # Q
<br /> BACKFILL s
<br /> TOP HAT AND ADAPTER 42" OR 3b" @ EASY 4.1 `�{
<br /> d
<br /> 48 49 50 Y/ MONITORING GAP IYP. OF (2) LIFT MANHOLE W/ 12° J a
<br /> 69 AND ADAPTOR :�„ 1/2" PVC DRAIN PI 24"
<br /> a 5 EXPLJAW-TOSIONN PROOF ION BOX 24}" iv X 12" L6. OBSERVATION DOOR 31 N O V O
<br /> ^0 21 n a z Q ° G d
<br /> " CONDUIT GRAVEL y,
<br /> rn FROM FILL SUMP TYP. OF (2) JUNCTION BOX �' " �[� , ° +,' STYROFOAM KFILL 28 2" BALL VALVE ?o e: J°t�" N Q U,^' 2" x11-5TYROOAMO,: 11
<br /> I-I/2" TEST ASSEMBLY °
<br /> 45 4qEXPLOSION PROOF PRESSURIZED LINE LEAK PULL PORT "` � O
<br /> E E 65 DETECTOR TYR. OF (2) ® 4 3 48" OR 42" FIBERGLA55 , .UNCTION BOX (n
<br /> 46 1" (4) STUDS DOUBLE SUMP TUBE W/LID EXPLOSION PROOF
<br /> o O 21 ENDED ENTRY FITTING - ELECTRICAL 5EAL OFF ELECTRICAL SEAL OFF Q
<br /> o m o TYENDEDD ENTRY FITTING EXPL0510N PROOF
<br /> p. OF (2) EXPLOSION PROOF TYP. OF (2) 3/4" SUDS DOUBLE
<br /> , 0 ` "/,� - TANK 2" 90° ELL,5GR'D, 1500
<br /> 20
<br /> r I o I" CONDUIT FROM - - I" CONDUIT
<br /> M.I., BLACK, TYP. OF (4) SHEET TITLE
<br /> r x TLS_35OR 3/4" CONDUIT FROM
<br /> Q O
<br /> 20 VARIABLE FREQUENCY _ % -I/2" TEST ASSEMBLY misc.
<br /> + - SENSOR MOUNTING KIT ® CONTROLLER MISC.
<br /> al s 105 OF 2) PENETRATION 10 BOLT I" CONDUIT TO /� CO-FLEX
<br /> 28 _ 2" X 4.8", TYP. OF (2) O NEXT TURBINE SUMP / `%yl,; 1 NAL PRODUCT DOUBLE FUELING
<br /> s (TYP. OF 3) 5/4 '0LNEFT FROM I" (4) STUDS DOUBLE """� INN551DEP4�ROCK ARD 63 64 DETAILS
<br /> i 8 3/4" CONDUIT CONTROLLER i; I-I/2" COFLEX DOUBLE 21 ENDED ENTRY FITTING 2" X 4.8" PENETRATION
<br /> a oFROM VARIABLE WALL PRODUCT PIPE INSIDE 63 64 I 10 BOLT SEAL 69
<br /> ro o BALL VALVE FREQUENCY 9/4" (4) STV05 DOUBLE u, 4" ROGKWARD, TYR OF (2) WESTERN FIBER6LA55
<br /> 'o N NORMALLY GL05E0 CONTROLLERS, 20 ENDED ENTRY FITTI n 2"@X 24" L6. M x M5 - --- ��
<br /> y a TYP.OF (2) 46" FIBERGLASS
<br /> 2" NIPPLE X 3° L6 SCK,40 TE IS x 2"
<br /> TYR. OF (2) . 106 FLEX CONNECTOR PIPE END 2" MALE
<br /> > a� SUMP TUBE W/42"@ TOP HAT O
<br /> z CARBON STEEL BLACK, TEE I50%SCR'D,M.I., AND WATERTIGHT COVER 5 NON-SWIVEL W/ TWO CLAMPS 65 _
<br /> z" FULL PORT BALL i N✓E5TERN FIBERGLA55 SHEET NO.
<br /> 0 o TYP. OF (6) BLACK TYP. OF (2) ® VALVE
<br /> S - I 2" X 24" FLEX M x MS 35 RISER A I
<br /> TYP. OF (3) I I FLEX CONNECTOR TYP. OF (2) 106 IE�I 2"X COUPLING 150% M.L, BLACK ^ ^
<br /> NOTE: PLAN ® SENSOR MOUNTING KIT ` - .(
<br /> LL a PIPE ANGLE A7 ENTRY BOOT SHALL NOT EXCEED A 15 DEG. ANGLE IN ANY DIRECTION O RISER I I v v
<br /> INSTALL MANHOLE COVER TO OPEN PERPENDICULAR TO qOF TANK. SEE: PLAN VIEW (SEE NOTE 2,SHEET F52) IVE w LIQUID 5EN50R s2 SECTION LIQUID SENSOR 52
<br /> 3 DUAL SUBMERSIBLE PUMP MANWAY NORMA BALL LY CLOSEDn SUBMERSIBLE PUMP MANWAY
<br /> NOT TO SCALE 2 90° ELL, SGRD, 150% NOT TO SCALE
<br /> G
<br /> SECTION M.I.,BLACK, TYR OF(Z FOR SIX OR MORE D 15REN5ER5, SEE NOTES ON SHEET F52
<br />
|