Laserfiche WebLink
FUEL DISPENSER <br /> FUEL DISPENSER STABILIZER BAR <br /> STABILIZER BAR FUEL DISPENSER STABILIZER BAR <br /> I I/2" (p PIPE RISER SPRING NUT I I/2" (P PIPE RISER <br /> SPRING NUT I" STREET 90° W/ 1" @ NPT SPRING NUT UNION (FURNISHED BY MFR) UNION(FURNISHED BY MFR) <br /> PLUG NIPPLE 4 UNION(SUPPLIED SEAL "WATER TIGHT" <br /> 5EA1- "WATER TIGHT" BY CONTRACTOR) TO BE AT ALL OPENINGS MOUNTING PLATESAFEWM <br /> AT ALL OPENINGS CONNECTED YU DISPENSER AT �NIIGHT�� MOUNTING PLATE <br /> TOP OF ISLAND 30 SPLASHGUARD 5PLA'�iCUARD TOP OF ISLAND 30 SPLASHGUARD <br /> TOP OF ISLAND <br /> _ DOOR KIT • i c D = <br /> DOOR KIT 3I <br /> 31 ° 0 D DOUBLE SHEAR VALVEDOUBLSH <br /> E EAR VALVE(SHEAR <br /> O O <br /> ° O O (SHEAR VALVE GROOVE TO ��- O O 11 SHEAR VALVE GROOVE TO BE <br /> 1 ° IT BE INSTALLED FLUSH W/TOP FRP DISPENSER ° INSTALLED FLUSH WITH TOP OF <br /> - SHEAR VALVE I6 I - _ <br /> Or BLOCK SUMP Al TOP FRAME 29 <br /> 29. °JUMP yv PRA- iii FRF 015PENSER ° A STOP FRAMER 2q P �� , 24 FLEX CONNECTOR, M x MS i 4 FLEX CONNECTOR,M x M5 <br /> 5EN50R MOUNTING BOOT <br /> �4 2" BELL MALE <br /> JUNGTION 1EE i � 4" BOOT KIT 54 y0 REDUCER <br /> i� FRP ADAPTER FITTING REDUCER REVISIONS <br /> 69 4" BULK HEAD b9 44 BULK HEAD <br /> ENTRY FITTING REVISPD IM EHO <br /> PENETRATION TEST 8007 ENTRY FITTING TEST BOOT— Qi WMiENT5 I1/03/03 <br /> (BULKHEAD) <br /> FLEX CONNECTOR FITTING TIO <br /> M x MS 2q. _ REVISED FOR <br /> E�)y (1) 1" CONDUIT DATA < I j PERMIT 02/20/04 <br /> 69 FOYER CONDUCTORS 4" FLEXIBLE <br /> 2" COAX FRP FOR g4 4° FLEXIBLE ROCK (2) 3/4" CONDUITS 64 � � X04 <br /> RECOVERY LINES TO VAPOR G VER WARD - INTERCOM d LIQUID ROCK WARD <br /> SLOPE DOWN I/8" ASSEMBLY 66 y3 FLEXIBLE PIPE SLOPE PER ./UMP 5EN50R 63 FLEXIBLE PIPE SLOPE PER <br /> PIPING PLAN (MIN. I/8" PER <br /> TO REGULAR UNLEADED TANK. LIQUID SENSOR 51. PIPING PLAN(MIN. 1/8" PER *G10° ELBOW <br /> SEE: PIPING OR05SOVER M. FOOT TOWARDS TANK) FITTING 611 FOOT TOWARDS TANK) <br /> SENSOR CUP 32 SENSOR CUP 32 FLEXIBLE PIPE FLEXIBLE PIPE <br /> TERMINATION LIQUID SENSOR 51 <br /> FITTING125 OR�26) DIRECT CONNECTION DIRECT CONNECTION <br /> CLAMP5 SENSOR CUP 32 CLAMPS <br /> 1 SUBMITTAL <br /> 1 VAPOR RECOVERY PIPING DETAIL @ DISPENSER NOT TO SCALE A N.T.S. SEE SHEET JUNCTION DISPENSER SUMP DETAIL TERMINATING DISPENSER SUMP DETAIL NOT USED DA1E5 <br /> �} 0 NOT TO SCALE OWNER. <br /> ° F51, DETAIL 6, NOTE 4. N.T.S. • SEE SHEET F51, DETAIL 6, NOTE 4. <br /> --- ------ <br /> ---- ._. . ._ REG. A6ENCIE55UBMITTAL <br /> HINGE - - - 09/06/03 <br /> 1-1/2" TEST TANK LEVEL MONITOR 50 49 48 PRESSURIZED LINE LEAK DETECTOR 42" OR 36" @EASY LIFT OUT TO BID: 10/111/03 <br /> ASSEMBLY 2" SCR'D TEE W/MONITORING GAP <br /> It <br /> TYP. OF (2 150% M.I., BLACK AND ADAPTER 2 H. P. TURBINE I ® OBSERVATION DOOR 3.1 4.1 <br /> MANHOLE YV 12" <br /> 24" I12' PVC DRAIN PIPE 8� <br /> LGN5GHL40 3 _ X 12" L6. z A, <br /> n <br /> CARBON STEEL ° ° ° W 5 R- <br /> lu <br /> BLACK, a <br /> 63 64 TYP. OF (2) {' E f <br /> o= iv PEA GRAVEL <br /> 2" SGRV ELL 90° z� 4 <br /> JUNCTION BOX - _ BACKFILL <br /> 150%,M.I.,BLACK EXPLOSION PROOF '�= �' S='�>G c�;:''o;CS . z <br /> Tyr. OF (2) 26 2'S LL vE :o o;�.o),�_,e aha °x 1'-O" x I'-D" w � <br /> STYROFOAM <br /> (TYP. OF 2) <br /> 0 0 3 4 JUNCTION BOX A <br /> 3 48" OR 42" FIBER6LA55 ✓ F z <br /> ¢TANK 2 — g SUMP TUBE W/LID , EXPLOSION PROOF F <br /> 52 3/4" (4) 51VDS DOUBLE ELECTRICAL SEAL OFF <br /> 21 ®ENDED ENTRY FITTING EXPLOSION PROOF vva�y sw� <br /> 5/4" CONDUIT FROM I" CONDUIT NOTE dm <br /> 33 VARIABLE FREQU2NCY FOR DIESEL PRODUCT USE ONLY BLACK <br /> CONTROLLER 1 b <br /> ' -1/2" TEST A55EMOLY IRON PIPE AND FITTINGS WHERE <br /> GALVANIZED PIPE IS GALLED FOR. <br /> 48 4q 50 y I" RI61D CONDUIT 1 <br /> a, I" CONDUIT TO I-I/2" CO-FLEX DOUBLE <br /> ZO NEXT TURBINE SUMP �'1"i;,'; _ WALL PRODUCT PIPE b3 64 <br /> 3/4" CONDUIT l INSIDE 4" ROCK GUARD 3 <br /> 28 ( , OF FROM FILL SUMP 21 1" (4) STUDS DOUBLE 2" X 4.8" PENETRATION <br /> O ENDED ENTRY FITTING 10 BOLT 5EAL bq <br /> WESTERN FIBERGLASS, O <br /> _ TYP. OF (2) <br /> PROJECT NO. <br /> PLAN 06 FLEX CONNECTOR _ --- PIPE END 2" MALE 098.40 <br /> NON-SWIVEL W/ TYO CLAMPS DRAWN 8Y: <br /> NOTE: PIPE ANGLE AT ENTRY BOOT SHALL NOT EXCEED A 15 DEG. ANGLE IN ANY DIRECTION WESTERN FIBERGLASS, TYP. OF (2) <br /> O RISER CHECKED BY. <br /> 2"X COUPLING <br /> a ® SENSOR MOUNTING KIT 150% M.1., BLACK <br /> .P ! CAD SAVED NAME: <br /> 2"10'tFS3,dw <br /> 2'•/ �j TEE OUTLET @ TURBINE SUMP SECTION LIWID SENSOR 52 NOT USED <br /> N.T.B. - <br /> 0 48" @ EASY LIFT MANHOLE ® PRE55URIZED LINE LEAK DETECTOR O <br /> HINGE <br /> WITH 12" OBSERVATION 51 TANK LEVEL MONITOR (y C3 <br /> 52 63 64 TANK LEVEL MONITOR 105 2 H. P. TURBINE PUMP DOOR 48 49 50 W/MONITORING GAP ® 2 H. P.TURBINE PUMP PEA &RAVEL # Q <br /> BACKFILL s <br /> TOP HAT AND ADAPTER 42" OR 3b" @ EASY 4.1 `�{ <br /> d <br /> 48 49 50 Y/ MONITORING GAP IYP. OF (2) LIFT MANHOLE W/ 12° J a <br /> 69 AND ADAPTOR :�„ 1/2" PVC DRAIN PI 24" <br /> a 5 EXPLJAW-TOSIONN PROOF ION BOX 24}" iv X 12" L6. OBSERVATION DOOR 31 N O V O <br /> ^0 21 n a z Q ° G d <br /> " CONDUIT GRAVEL y, <br /> rn FROM FILL SUMP TYP. OF (2) JUNCTION BOX �' " �[� , ° +,' STYROFOAM KFILL 28 2" BALL VALVE ?o e: J°t�" N Q U,^' 2" x11-5TYROOAMO,: 11 <br /> I-I/2" TEST ASSEMBLY ° <br /> 45 4qEXPLOSION PROOF PRESSURIZED LINE LEAK PULL PORT "` � O <br /> E E 65 DETECTOR TYR. OF (2) ® 4 3 48" OR 42" FIBERGLA55 , .UNCTION BOX (n <br /> 46 1" (4) STUDS DOUBLE SUMP TUBE W/LID EXPLOSION PROOF <br /> o O 21 ENDED ENTRY FITTING - ELECTRICAL 5EAL OFF ELECTRICAL SEAL OFF Q <br /> o m o TYENDEDD ENTRY FITTING EXPL0510N PROOF <br /> p. OF (2) EXPLOSION PROOF TYP. OF (2) 3/4" SUDS DOUBLE <br /> , 0 ` "/,� - TANK 2" 90° ELL,5GR'D, 1500 <br /> 20 <br /> r I o I" CONDUIT FROM - - I" CONDUIT <br /> M.I., BLACK, TYP. OF (4) SHEET TITLE <br /> r x TLS_35OR 3/4" CONDUIT FROM <br /> Q O <br /> 20 VARIABLE FREQUENCY _ % -I/2" TEST ASSEMBLY misc. <br /> + - SENSOR MOUNTING KIT ® CONTROLLER MISC. <br /> al s 105 OF 2) PENETRATION 10 BOLT I" CONDUIT TO /� CO-FLEX <br /> 28 _ 2" X 4.8", TYP. OF (2) O NEXT TURBINE SUMP / `%yl,; 1 NAL PRODUCT DOUBLE FUELING <br /> s (TYP. OF 3) 5/4 '0LNEFT FROM I" (4) STUDS DOUBLE """� INN551DEP4�ROCK ARD 63 64 DETAILS <br /> i 8 3/4" CONDUIT CONTROLLER i; I-I/2" COFLEX DOUBLE 21 ENDED ENTRY FITTING 2" X 4.8" PENETRATION <br /> a oFROM VARIABLE WALL PRODUCT PIPE INSIDE 63 64 I 10 BOLT SEAL 69 <br /> ro o BALL VALVE FREQUENCY 9/4" (4) STV05 DOUBLE u, 4" ROGKWARD, TYR OF (2) WESTERN FIBER6LA55 <br /> 'o N NORMALLY GL05E0 CONTROLLERS, 20 ENDED ENTRY FITTI n 2"@X 24" L6. M x M5 - --- �� <br /> y a TYP.OF (2) 46" FIBERGLASS <br /> 2" NIPPLE X 3° L6 SCK,40 TE IS x 2" <br /> TYR. OF (2) . 106 FLEX CONNECTOR PIPE END 2" MALE <br /> > a� SUMP TUBE W/42"@ TOP HAT O <br /> z CARBON STEEL BLACK, TEE I50%SCR'D,M.I., AND WATERTIGHT COVER 5 NON-SWIVEL W/ TWO CLAMPS 65 _ <br /> z" FULL PORT BALL i N✓E5TERN FIBERGLA55 SHEET NO. <br /> 0 o TYP. OF (6) BLACK TYP. OF (2) ® VALVE <br /> S - I 2" X 24" FLEX M x MS 35 RISER A I <br /> TYP. OF (3) I I FLEX CONNECTOR TYP. OF (2) 106 IE�I 2"X COUPLING 150% M.L, BLACK ^ ^ <br /> NOTE: PLAN ® SENSOR MOUNTING KIT ` - .( <br /> LL a PIPE ANGLE A7 ENTRY BOOT SHALL NOT EXCEED A 15 DEG. ANGLE IN ANY DIRECTION O RISER I I v v <br /> INSTALL MANHOLE COVER TO OPEN PERPENDICULAR TO qOF TANK. SEE: PLAN VIEW (SEE NOTE 2,SHEET F52) IVE w LIQUID 5EN50R s2 SECTION LIQUID SENSOR 52 <br /> 3 DUAL SUBMERSIBLE PUMP MANWAY NORMA BALL LY CLOSEDn SUBMERSIBLE PUMP MANWAY <br /> NOT TO SCALE 2 90° ELL, SGRD, 150% NOT TO SCALE <br /> G <br /> SECTION M.I.,BLACK, TYR OF(Z FOR SIX OR MORE D 15REN5ER5, SEE NOTES ON SHEET F52 <br />