My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:32:25 AM
Creation date
5/15/2019 11:44:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, UST SYSTEM DRAWING INFORMATION <br /> 1- Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2- Plans drawn to scale in non-erasable print. <br /> 3, X Plot plan to show location of tanks and all associated piping. <br /> 4- X Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5- X, Tank cross-sectional diagram. <br /> 6- X Detail of tank, associated piping, excavation and cover. <br /> 7- '� Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> B, X Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9- Y, Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. X At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (2') containment systems before covering. [Section 2635 (a) (3) 8 (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-END from the testing company or owner of facility. [Health 8 Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # �j# z, # # # <br /> CAPACITY 25 doo z 00(0 8 040 <br /> MANUFACTURER OU R 00�Zl 0 0 <br /> COMPOSITION <br /> MODEL r <br /> PRODUCT P, <br /> C� UL.k1R S opn-K <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13- (s TO BE INSTALLED <br /> I A. �C" F SteeL_Zl -ci4�fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> ' 7n or co rings. <br /> 1 , <br /> �/� (1) Tested at the installation site using an electric resistance holiday detector. <br /> h _-(2) Vacuum applied to interstitial space. <br /> N B. Fiberglass <br /> (1) installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> ` C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.